PANCHAYAT RAJ ENGINEERING

DISTRICT PANCHAYAT RAJ ENGINEER, MAHABUBABAD

The Government during the formation/re-organization of new Districts , have issued orders designated the PIU Divisions located in every District headquarter as District Office and District officer Designated as District Panchayat Raj Engineer (DPRE) and will act as District Head. Executive Unit of the Department is the division .Accordingly, the Executive Engineer PR Mahabubabad is a District Head and called as District PR Engineer (DPRE) PIU Division, Mahabubabad.  The PIU Division, Mahabubabad is having (16) Mandals jurisdiction.

The District Panchayat Raj Engineer, Mahabubabad  is having  6 Sub-Divisions located at Mahabubabad, Gudur, Maripeda, Dornakal, Garla and Thorrur  to execute the developmental activities in the Panchayat Raj Department. 

 

STAFF PARTICULARS UNDER THE CONTROL OF DISTRICT PANCHAYAT RAJ ENGINEER, MAHABUBABAD
S.No Name of the Employee Designation   Place of working Contract  Mobile No. e-Mail ID

1

K. Suresh

DPRE

DPRE Mahabubabad

9121135950

suresh.koricharla@gmail.com

2

P.Narendranadh

DAO (W)

DPRE Mahabubabad

9848125509

pnarendradao@gmail.com

3

M.Aruna

Superindenent

DPRE Mahabubabad

9885962522

 

4

B.Chandrashekar Reddy

Senior Assistant

DPRE Mahabubabad

9441278695

shekharreddy.BC@gmail.com

5

T.Vijay Mohan

Senior Assistant

DPRE Mahabubabad

9866963252

vijaymohan3252@gmail.com

6

G.Sydulu

Sr.Asst

DPRE Mahabubabad

8897691367

gorrepatisaidulu2012@gmail.com

7

M.SuryaPrakash

Junior Assistant

DPRE Mahabubabad

9985849935

suryamamindlapelly@gmail.com

8

Vacant

Junior Assistant

DPRE Mahabubabad

 

 

9

R.V.Shashikala

Typist

DPRE Mahabubabad

9492911264

shashikalareddyboina@gmail.com

10

Vacant

Typist

DPRE Mahabubabad

 

 

11

D.Lalitha

A E E

DPRE Mahabubabad

9490072046

lalitha.aeepr@gmail.com

12

K. Rajashekarao

A E E

DPRE Mahabubabad

 9492712612

rajashekar.pred@gmail.com

13

M.Mohan Rao

A E

DPRE Mahabubabad

9440146376

mohanrao.marri@gmail.com

14

N.Purna Chander

A E

DPRE Mahabubabad

7207681550

purnachandarnid@gmail.com

15

Jacob. Sikamani

T O

DPRE Mahabubabad

9704517905

 

16

Vacant

ATO

DPRE Mahabubabad

 

 

17

Vacant

TA

DPRE Mahabubabad

 

 

18

SD.Gouse Pasha

O S

DPRE Mahabubabad

8501910269

shaikgousepasha786@gmail.com

19

G. Ilumallu

O S

DPRE Mahabubabad

9390464060

 

20

P.Venkateshwarlu

O S

DPRE Mahabubabad

8465856560

 

21

T. Rani

O S

DPRE Mahabubabad

9666391202

 

22

MD.Raheemuddin

Night Watchman

DPRE Mahabubabad

8520869446

 

DEPUTATION OF STAFF TO DPRE.M’BAD FROM OTHER OFFICES

1

B. Srinivasulu

AEE

Deputed from PRSD. Maripeda

7396600110

srinivasubhukya@gmail.com

2

K. Umamaheshwar Rao

AEE

Deputed from MPP. Nellikudur

7382967336

 

3

D.Madan singh

 T O

Deputed from DPRE Kothagudem

7981596254

madansingh@gmail.com

4

P. Buchaiah

OS

Deputed from EE, V&QC. Div. Warangal

9493261251

 

P.R. SUB-DIVISION, MAHABUBABAD

1

V. Jumkilal

Dy.EE. (FAC)

PR SD, Mah’bad

9440449270

aeprmaripeda@gmail.com

2

B. Prabhakar

A.E

PR SD, Mah’bad

9246667222

 

3

B. Sreenivas Reddy

JTO

PR SD, Mah’bad

9440691838

srinivasreddyboppidi112@gmail.com

4

S.Krishnaiah

Sr.Asst

PR SD, Mah’bad

9949438004

 

5

MD. Habeebunisa Begum

O.S

PR SD, Mah’bad

9989943663

 

P.R. SUB-DIVISION, GUDUR

1

S. Rajkumar

Dy.E.E

PR SD, Gudur

9121135952

rk.kumar678@gmail.com

2

Vacant

AEE/AE

PR SD, Gudur

 

 

3

B. Yeshwanth

A.E.E

PR SD, Gudur

9494922936

yashwanth.bitla@gmail.com

4

M. Ramesh

JTO

PR SD, Gudur

9948749394

 

5

Vacant

Sr.Asst

PR SD, Gudur

 

 

6

MD.Sajidali

O.S

PR SD, Gudur

 

 

P.R. SUB-DIVISION, MARIPEDA

1

P.Vidyasagar

Dy.EE

PR SD, Maripeda

9121135953

porikavidyasagar@gmail.com

2

B. Srinivas

A.E.E

PR SD, Maripeda

7396600110

srinivas.aee11@gmail.com

3

Vacant

A.EE./AE

PR SD, Maripeda

 

 

4

M.Veerabhadram

JTO

PR SD, Maripeda

9866294415

 

5

CH. Ravi kumar

Sr.Asst

PR SD, Maripeda

7989934034

ravikumarch11@yahoo.com

6

MD. Saheb Hussain

O.S

PR SD, Maripeda

9949543012

 

P.R. SUB-DIVISION, DORNAKAL

1

U. Mahesh Babu

Dy.E.E (FAC)

PR SD, Dornakal

9121135954

maheshuppadi8088@gmail.com

2

K.Uday Kumar

A.E

PR SD, Dornakal

9849616550

udayraj009@gmail.com>,

3

Vacant

JTO

PR SD, Dornakal

 

 

4

CH.Srinivas

Sr.Asst

PR SD, Dornakal

9966840477

srinivastypist@gmail.com

5

Vacant

O.S

 

 

 

P.R. SUB-DIVISION, THORRUR

1

K.Prasannakumar

Dy.EE

PR SD, Thorrur

9121135955

kpk24081966@gmail.com

2

K. Suresh

A.E

PR SD, Thorrur

7659802252

sureshkusuma2@gmail.com

3

Vacant

JTO

PR SD, Thorrur

 

 

4

G.Jagadish

Sr.Asst

PR SD, Thorrur

9701889616

 

5

MD. Mahaboob Ali

OS

PR SD, Thorrur

 

 

P.R. SUB-DIVISION, GARLA

1

Ch.Aravind Babu

Dy.EE

PR SD, Garla

9121135956

prsdgarla@gmail.com

2

Vacant

A.E.E

 

 

 

3

B. Jagadish

JTO

PR SD, Garla

7702929894

 

4

Vacant

Sr.Asst

 

 

 

5

B. Banuprakash

OS

PR SD, Garla

 

 

 

Mandal Engineering Officers who are working in Mandal Praja Parishad’s in the District

 

1

M. Rajasekhar

A.E

 MPP Mahabubabad

9440141000

rajashekarmangu@gmail.com

2

MPP. Nellikudur (FAC)

3

K. Udaykumar

A.E (Spl.)

MPP Kesamudram

9182612877

udayraj009@gmail.com

4

S. Kishor Kumar

A.E

MPP Garla

9121135979

kishorekumar_sv@yahoo.com

5

MPP Dornakal (FAC)

6

M. Srinivas

A.E

MPP Kuravi

7660835828

saisrinivasrao666@gmail.com

7

D.Srinivas

AEE

MPP Maripeda

9121135981

srinivas.aee11@gmail.com

8

MPP Chinnagudur (FAC)

9

M. Narsingh

AEE

 MPP Narsimhulapet

9121135973

mnarsingh5@gmail.com

10

MPP Danthalapally (FAC)

11

MD Safdar Aali

AE

MPP Gudur

9121135976

safder_ali0123@yahoo.com

12

B. Yeshwanth

AEE (Spl.)

MPP Kothaguda,

9494922936

yashwanth.bitla@gmail.com

13

MPP  Gangaram

14

N.Yugendar

AE

MPP Thorrur

9490548456

ugendernimmala@gmail.com

15

K. Suresh

AE (Spl.)

MPP Peddavangara

7659802252

sureshkusuma2@gmail.com

16

M.Rajashekar

AEE

MPP.Bayyaram

9121135980

rajasekhar.pred@gmail.com,

 

Mahabubabad District consists of 16 Mandals, 461 Gram Panchayaths and 848 Habitations. The Panchayati Raj Department is maintaining 984 roads with length of 2328.58 Kms.as follows:

  • T. Roads             :           935.31 K.Ms.
  • C. Roads             :           126.06 K.Ms.
  • WBM Roads             :           42 K.Ms.
  • Gravel/Earthen Roads :           79 K.Ms.

 

 The Department execute Construction of Rural Roads and Buildings.  The following are the main schemes taken up by P.R. Engineering Department  sanctioned  and other grant works entrusted by the District Collector.

  1. PMGSY
  2. MPLAD(Member of Parliament legislative area development)
  3. SDF (Special Development Fund)
  4. SDF( Palle Pragathi Programme)
  5. CDP (Constituency Development Programme)
  6. DMFT (District Mineral Foundation Trust)
  7. CBF (Crucial Balance Fund)

 

MGNREGS Grant with Matching grants :

  1. Rythu Vedika work sheds
  2. Crematoriums
  3. C. Roads
  4. P. Buildings
  5. Anganwadi Buildings

The progress of works sanctioned under various schemes mentioned as follows:

Sl.

No.

Name of the Grant

No.of works Sanctioned

Estimated cost

No.of works completed

No.of works Progress

No.of works Not-started

1.

PMGSY Ph.X

 

14

1667.52

13

0

1

2.

PMGSY Ph.XI

 

22

2818.08

21

1

0

3

PMGSY LWEP

 

75

9505.23

73

2

0

4.

PMGSY-III

 

02

1101.82

0

02

0

5.

MPLADS-

Hon’ble MP. Mahabubabad

16

81.84

09

05

02

6.

S.D.F.

 

1196

11798.89

1077

86

33

7.

SDF(PPP)

 

22

104.53

18

04

0

8.

CDP 17-18&18-19

 

213

796.70

190

10

13

9.

DMFT

 

31

1921.32

0

29

02

10.

CBF

 

81

319.48

72

04

05

 Agriculture & Coop. Dept. Fund and MGNREGS.Grant

    11.

Rythu Vedika Work Sheds

52

1144.00

52

0

0

 

MGNREGS.Grant :

12.

Crematoriums

382

4813.20

46

329

07

 

13.

CC-Roads 19-20

993

4664.5

474

130

389

 

14.

GP. Buildings 16-17

76

1216.00

22

29

25

 

15

Anganwadi buildings (Incomplete)

05

18.50

03

02

0

 

 

PROGRESS REPORT OF WORKS SANCTIONED UNDER VARIOUS GRANTS IN MAHABUBABAD DISTRICT

1.        PMGSY Phase – X

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

1

Gudur

R/F PWD Road to Boda Bichya thanda upto Madanapur

91.290

82.92

Completed & Finalled

2

Gudur

R/F Line thanda to Eppala thanda

79.670

74.47

Completed & Finalled

3

Gudur

R/F Govindapur to Daravath Samya thanda

82.940

73.29

Completed & Finalled

4

Gudur

R/F PWD Road to Neelavancha

308.030

205.05

Completed & Finalled  upto OAS amount Agrt.conculded for RAS amount of Rs.103.00L

5

Gudur

Dameravancha to Pilligundla thanda

75.650

71.41

Completed & Finalled

6

Kesamudram

R/F PWD Road to Muthyalamma thanda

60.500

57.57

Completed & Finalled

7

Peddavangara

R/F PWD Road to Teekya thanda

50.800

42.17

Completed & Finalled

8

Kothaguda

PWD Road to Kodiselamitta

489.500

438.23

Completed & Finalled

9

Mahabubabad

R/F PWD Road to Jeripothula thanda

69.860

55.98

Completed & Finalled

10

Mahabubabad

R/F PR Road to Regadi thanda

52.990

42.82

Completed & Finalled

11

Mahabubabad

R/F PWD Road to Regadigudem

135.070

105.03

Completed & Finalled

12

Mahabubabad

R/F PWD Road to Rotibanda thanda

74.900

55.88

Completed & Finalled

13

Maripeda

R/F PWD Road to Laxman thanda

60.450

46.16

Completed & Finalled

14

Maripeda

R/F PWD Road to Boda thanda

35.870

24.94

Completed & Finalled

 

 

TOTAL : PMGSY PHASE – X

1667.52

1375.92

 

 

  1. PMGSY Phase – XI

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

1

Gudur

L077-PWD Road to V Ramulu Thanda (VR61)

98.420

95.07

Completed & Finalled

2

Gudur

L078-PWD Road to Vasuram thanda (VR62)

189.520

180.81

Completed & Finalled

3

Kesamudram

L051-PWD Road to Chaitanya Nagar (VR38)

96.640

95.24

Completed & Finalled. 

4

Kesamudram

R/F L054-Komatipally to Baroji Thanda (VR41)

154.260

148.72

Completed & Finalled. 

5

Kesamudram

L053-Komatipally to Jamla Thanda (VR40)

199.270

196.22

Completed & Finalled. 

6

Kesamudram

L052-Kesamudram to Jogya Thanda (VR39)

110.930

105.89

Completed & Finalled. 

7

Kesamudram

L057-PWD Road to Gaddibodu Thanda (VR44)

98.610

97.74

Completed & Finalled. 

8

Kesamudram

L049-Intikanne to Desya Thanda (VR36)

125.000

118.10

Completed & Finalled. 

9

Kesamudram

L058-PWD Road to Ameenapuram Thanda (VR45)

220.180

211.31

Completed & Finalled. 

10

Kothaguda

L052-Kamaram To Barla Mallaiah Gumpu (VR34)

37.950

33.34

Completed & Finalled. 

11

Kothaguda

L053-Dubba Gudem to Miryalpet (VR35)

44.300

44.07

Completed & Finalled

12

Mahabubabad

L059-PWD Road to Signal Colony (VR45)

62.750

59.97

Completed & Finalled. 

13

Mahabubabad

L067-PR Road to Thavurya Thanda (VR53)

75.750

70.26

Completed & Finalled. 

14

Mahabubabad

L058-PWD Road to Eerla Thanda (VR44)

130.900

125.86

Completed & Finalled. 

15

Mahabubabad

L061-PWD Road to Gopalapuram (VR47)

125.100

121.60

Completed & Finalled

16

Mahabubabad

L065-PR Road to Abbugani Thanda (VR51)

98.750

92.98

Completed & Finalled. 

17

Mahabubabad

L066-PR Road to Bhajana Thanda H/o Mudupugal

147.000

142.56

Completed & Finalled.

18

Nellikudur

L065-Narsimhulagudem to Sandhya thanda (VR50)

115.440

109.66

Completed & Finalled.

19

Nellikudur

L066-PWD Road to Balunaik thanda (VR51)

112.400

112.9

Completed & Finalled. 

20

Gudur

C/o High Level Bridge across Local Vagu at Km 0/5 on R/F Ponugodu to Line thanda

176.000

57.53

Raft C,  Abutments & Piers -P

21

Narsimhulapet

C/o High Level Bridge across Local vagu at Km 2/8 on R/F PWD Road to Datla

208.900

137.49

Completed & Finalled

22

Thorrur

C/o High Level Bridge across local vagu at Km 1/9 on R/F PWD Road to Chikataipalem

190.010

169.51

Completed & Finalled

 

 

TOTAL :

2818.08

2526.83

 

 

  1. PMGSY LWEP WORKS:

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

1

Garla

L042-Pullaram ZP road to Gyamathanda

72.740

72.57

Completed & Finalled

2

Garla

L033-Pulluru Zp road to R and B road via Venkatapuram thanda

59.140

58.89

Completed & Finalled

3

Garla

L040-Pulluru ZP road to Jarpulalingaiahthanda

142.931

142.63

Completed & Finalled

4

Garla

ML01-R and B road to Gandithanda

70.800

70.63

Completed & Finalled

5

Garla

L039-Pulluru ZP Road to Kattukunta thanda

427.560

426.53

Completed & Finalled

6

Garla

L038-Patha Pocharam to Gangaram thanda

105.270

104.99

Completed & Finalled

7

Garlabayyaram

L038-ZP Road to Thri Thri Thanda

106.262

103.82

Completed & Finalled

8

Garlabayyaram

L043-ZP Road to Jaginithanda

131.981

129.16

Completed & Finalled

9

Garlabayyaram

ML01-R and B Road to Bandlakunta

117.332

114.89

Completed & Finalled

10

Garlabayyaram

L042-ZP Road to Thatigumpu

158.429

153.58

Completed & Finalled

11

Garlabayyaram

L039-ZP Road to Kothathanda

135.300

131.49

Completed & Finalled

12

Garlabayyaram

L041-ZP Road to Chinthalathanda

78.361

76.34

Completed & Finalled

13

Garlabayyaram

L040-ZP Road to Singaram

92.404

90.16

Completed & Finalled

14

Garlabayyaram

L045-ZP Road to Chunchubandam thanda

81.494

79.33

Completed & Finalled

15

Gudur

L032-Mattewada road to veerampet

741.250

479.40

Completed upto GSB and (22/22) CD Works – C Metal collection for WMM is in Progress

16

Gudur

ML01-Kongarigidda to Matwada

159.470

158.99

Completed & Finalled

17

Gudur

L041-PWD Road to Ausalithanda

75.810

63.15

Completed & RAS required

18

Gudur

L071-PWD Road to Dasru thanda

86.870

86.64

Completed & RAS required

19

Gudur

L025-PWD road bhukyadasru thanda

128.080

127.73

Completed & RAS required

20

Gudur

L081-L045 PR road to Tekula thanda

100.540

100.27

Completed & RAS required

 

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

           

22

Gudur

L057-Bollepally to vailibandam

81.370

78.06

Completed & Finalled

23

Gudur

L079- PR Road to Anjaneya thanda H/o Gundenga

54.080

53.95

Completed & Finalled

24

Gudur

L080-R and B Road to Kundelu lakya thanda

49.520

49.41

Completed & Finalled

25

Gudur

ML04- Govindapur to Line thanda via Janguthanda,Piligundlathanda

203.750

202.12

Completed & Finalled

26

Gudur

ML05-T03 Madanapuram to Birbal thanda

43.290

43.2

Completed & Finalled

27

Kothaguda

L033-PWD Road to Rangappagudem

122.120

101.01

Completed & Finalled. 

28

Kothaguda

L057-Thimmapur to Adi Laxmipur

288.780

288.56

Completed & Finalled. 

29

Kothaguda

ML03-PWD road Pegadapally-Ladaigadda to Durgaram

100.280

100.08

Completed & Finalled. 

30

Kothaguda

L051-ZP Road to Masampally

62.980

62.9

Completed & Finalled. 

31

Kothaguda

L058-Kothapally-Routhgudem to Botimeedi thanda

327.920

327.82

Completed & Finalled. 

32

Kothaguda

ML04-Botimeedi thanda to Velubelly

113.700

113.7

Completed & Finalled. 

33

Kothaguda

ML01-Cheruvumundu thanda to Doravarivempally

573.500

288.63

CD Works-C,7.40 Km GSB – C – WMM – C BT tobe laid

34

Kothaguda

L022-ZP Road to Andugulagudem

74.880

73.89

Completed & Finalled.  

35

Kothaguda

L050-PWD Road to Venkammagumpu

68.040

63.65

Completed & Finalled. 

36

Kothaguda

ML02-Andugulagudem to Mahadevunigudem

133.00

132.82

Completed & Finalled. 

37

Kothaguda

L055-Mamidigudem to Kotagadda (Thallagumpu)

77.050

77.05

Completed & Finalled. 

38

Maripeda

L062-Pambanda thanda to Baliya thanda

64.140

63.03

Completed & Finalled

39

Maripeda

ML03-Thalla Ookal to Roopsingh Thanda

160.19

159.69

Completed & Finalled

40

Maripeda

ML02-PWD road at L035 to Pambnda thanda via Patha pambanda

77.420

76.97

Completed & Finalled

 

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

41

Maripeda

L064-PR road Chillamcherla to Burkithanda

105.052

104.72

Completed & Finalled

42

Maripeda

ML01-T02 Road to Thallookal via Chapla thanda

150.850

131.84

Completed & Finalled

43

Maripeda

L076-PWD road Kothur to Manchya thanda via Chinnakunta methuthanda

149.060

121.1

Completed & Finalled

44

Maripeda

L060-PWD road(Amrunaik thanda) to Ramu thanda H/o Galivarigudem

33.850

29.79

Completed & Finalled

45

Maripeda

ML04-Arlagadda thanda to Anepuram

181.490

175.2

Completed & Finalled

46

Maripeda

ML05-Venkatayya thanda (Bodiya thanda)to Neelikurthy Harizanawada

90.310

86.07

Completed & Finalled

47

Maripeda

ML06-Manchya thanda L051 to Jammikunta thanda

106.59

106.27

Completed & Finalled

48

Maripeda

ML07-Abbaipalem road to Yellarigudem road

84.44

84.19

Completed & Finalled

49

Garla Bayyaram

L037-ZP Road to Laxmathanda

123.030

119.78

Completed & Finalled

50

Garla Bayyaram

Construction of Bridge on Road from ZP road to Laxmathanda via Sambathanda

205.000

117.08

Completed & CR Submitted to CE for approval

51

Gudur

T01 Boddugonda thanda to Chinnagandi thanda

100.890

90.05

Completed & Finalled

52

Gudur

Kollapur road to Ippalathanda 

55.730

50.74

Completed & RAS sanctioned and Final Bill is to received

53

Gudur

ZP road to Banoth Bheemla thanda H/o Gundenga

39.470

35.07

Completed & Finalled

54

Gudur

PR road at Dappu thanda to Mangya thnada,Kopi thanda,Vagya thanda 

117.510

106.69

Completed & Finalled

55

Gudur

 PR road at Dapputhanda to Panthuliya thanda h/o Gundenga 

48.440

46.95

Completed & Finalled. 

56

Gudur

R&B road to Tejavath goriya thanda 

36.880

36.2

Completed & Finalled. 

57

Gudur

 ML road at  Chakru thanda to Bancharai thanda

115.940

107.64

Completed & Finalled. 

58

Gudur

Rajanpalli to Jillela 

51.770

46.88

Completed & Finalled. 

59

Kothaguda

L022-ZP Road near Timmapur to Gundam thanda

83.100

82.92

Completed & Finalled. 

60

Kothaguda

Gundam thanda to Pakala lake

274.940

266.02

Completed & Finalled. 

 

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

61

Maripeda 

PR road to Anakattathanda H/o Thanamcherla

45.170

44.48

Completed & Finalled. 

62

Maripeda 

Redya tahnda PR road to Dakna thanda

85.250

83.47

Completed & Finalled. 

63

Maripeda 

Loop- Maripeda  to Giripuramthanda

143.180

125.45

Completed & Finalled. 

64

Maripeda 

PWD road Komatikunta thanda 

35.640

23.17

Completed & Finalled. 

65

Maripeda 

PWD to Mallammakunta Thanda H/o Chillamcherla 

67.960

67.93

Completed & Finalled. 

66

Maripeda 

PWD road to Periyathanda 

29.790

29.7

Completed & Finalled. 

67

Maripeda 

Burahanpuram to Vachya thanda 

132.670

112.66

Completed & Finalled. 

68

Maripeda 

PWD road to Bothala thanda 

52.450

50.24

Completed & Finalled. 

69

Maripeda 

PWD road to Chepur Thanda

29.800

27.92

Completed & Finalled. 

70

Maripeda 

PWD road (Yellampet) to Jerpulathanda via Samiya thanda

51.360

50.48

Completed & Finalled. 

71

Maripeda 

Balini Darmraram to Mansingh thanda

155.290

146.41

Completed & Finalled. 

72

Maripeda 

PWD road to Pattikunta thanda (Jatoth) via Abbaipalem 

153.580

133.75

Completed & Finalled. 

73

Maripeda 

PWD road to Galivarigudem upto Thilavath thanda 

77.600

18.25

Completed & Finalled.

74

Gudur

C/o Bridge on R/F Chakru thanda to Bancharai thanda

435.72

431.132

Completed & Finalled

75

Gudur

R/F L064 – Ponugodu to Chirrakunta thanda

69.000

66.99

Completed & Finalled. 

TOTAL :

9505.23

8523.32

 

 

  1. PMGSY PHASE – III:

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

1

Dornakal

MRL10-Dornakal R B Road to Mulkalapally NH Road via Thodellagudem,Vennaram

833.19

0.00

Progress

2

Nellikudur

MRL02-PWD Road to Rajulakothapally via Sreeramgiri, Venkatapur.

268.63

0.00

Progress

TOTAL :

1101.82

0.00

 

 

  1. MPLADS 2019-20 (HON’BLE M.P. OF MAHABUBABAD PARLIAMANTARY CONSTITUENCY):

S.No.

Name of the Mandal

Name of the Work

Estt. cost

Expenditure

Status of the Work

1

Mahabubabad

Construction of District Library Building at Ground Floor in Mahabubabad

9.90

9.90

Completed

2

Mahabubabad

Construction of District Library Building at 1st Floor in Mahabubabad (V&M)

9.90

9.90

Completed

3

Kesamudram

L/o CC Road from Venkatagiri to Etigadda Thanda at Venkatagiri (V), Kesamudram (M)

5.00

 0.00

Completed

4

Kesamudram

L/o CC Road from Dealer Venkat Rao (H) to Madarapu Sathyanarayana (H) at Venkatagiri (V), Kesamudram (M)

5.00

 0.00

Completed

5

Chinnagudur

L/o CC Road from Guguloth Rangaiah (H) to Banoth Bavu Singh (H) in Thummala Cheruvu Thanda (V) of Chinna-             -Guduru (M)

5.00

 0.00

Progress

6

Mahabubabad

L/o CC Road from 1.Rega Lingaiah (H) to Bhukya Harisingh (H) 2.V.Krishna (H) to Nunavath Kishan (H) at Secunderabad Thanda (GP)

4.99

4.97

Completed

7

Mahabubabad

L/o CC Road from Thati Narasaiah (H) to Basava Cheruvu at Tekulagudem H/o  Secunderabad Thanda (GP)

4.99

4.97

Completed

8

Nellikuduru

Installation of LED Lights at Nainala (V)

0.63

 0.00

Progress

9

Nellikuduru

L/o CC Road from Kolipaka Venkanna (H) to Neelam Srinivas (H), Munigalaveedu (V)

4.99

 0.00

Progress

10

Danthalapally

C/o Link Road and Culvert from Bhagiratha water Tank to Teja Thanda, Bodlada (V)

4.99

 0.00

Progress

11

Narsimhulapet

L/o CC Road at Muthyalamma Gudi in Mungimadugu (V)

4.99

 0.00

Completed

12

Narsimhulapet

L/o CC Road at Kotha Thanda of Jaggu Thanda,

4.99

 0.00

Completed

13

Chinnagudur

L/o CC Road from PR Road to Govardhan (H) at Manchya Thanda in Uggampally (V)

4.99

 0.00

Progress

14

Kesamudram

Installation of Fourm Lighting ( Central Lighting ) at Ayyagaripelli (V)

1.50

 0.00

Not started

15

Nellikuduru

L/o CC Road from Gaddi Veerabhadram (H) to S.K. Maalambi (H) in Munigalaveedu (V)

4.99

 0.00

Completed

16

Mahabubabad

Construction of Culvert on PR Road from Perumandla Venkanna (H) to Perumandla Raju (H) at Anantharam (V)

4.99

 0.00

Agrt.stage

 

 

 TOTAL:

81.84

29.74

 

 

  1. S.D.F. (SPECIAL DEVELOPMENT FUND):( BALANCE WORKS):

Sl. No

Name of the Mandal

Name of the Work

Estimate cost

Expenditure

Stage of work

1

Danthalapally

BT to Road from Beersetigudem to Reponi of GP.Beerisettigudem

270.00

176.78

Progress

2

Danthalapally

BT to Road from Gunnepally to Melakunta  thanda via pandya thanda of GP.Gunnepally

140.00

33.55

Progress

3

Danthalapally

BT to Road from Gunepally to Bhicya Naik Thanda of GP. Gunnepally

155.00

36.76

Progress

4

Danthalapally

BT to Road from Kummarikuntla to nidanapuram of GP Kummarikuntla

135.00

29.22

Progress

5

Danthalapally

BT to Road from Kummarikuntla to Vemulapally of GP. Kummarikuntla

120.00

0.00

Progress

6

Dornakal

Laying of CC Road from GP road to sari (H) at pakeera thanda H/o chilkodu

5.00

0.00

Progress

7

Dornakal

BT to R/F from Kannegundla to Thodellagudem H/o Kannagundla

200.00

0.00

Progress

8

Dornakal

Laying of CC Road from Banoth Seetharam (H) to tejavath Chilakka (H) & Banoth Rama (H) to Bhukya Devadas (H) at kalyathanda H/o Mannegudem

5.00

0.00

Progress

9

Dornakal

Laying of CC Road from R&B Road to Veeraiah (H) and GP office to Pullaiah (H) a Grampanchayat Bazar at Ravigudem

5.00

0.00

Progress

10

Dornakal

BT to R/F from PR Road to Satyathanda H/o Uyyalawada

55.00

0.00

Progress

11

Kuravi

Construction of Community Hall at Pedda thanda H/o Gundrathimadugu (V)

24.00

7.20

Progress

12

Kuravi

Providing of Steps to Uphills of Laxminarsimha Swamy Temple at Kandikonda (V)

100.00

0.00

Progress

13

Kuravi

BT to Road from Banjara Thanda to Lachya Thanda H/o Ayyagaripally (V)

70.00

17.30

Progress

14

Kuravi

BT to Road from Nallela to Lingya Thanda H/o Balapala

143.00

58.59

Progress

15

Kuravi

BT to R/F R&B Road Kottathanda H/o Chintapally

192.00

0.00

Progress

16

Kuravi

L/O CC Road at Sc colony Gundrathimadugu (V), Mandula Peeraiah(H) to Yakaiah(H) via Dargaiah(H).

5.00

0.00

Progress

17

Kuravi

L/O CC Road at Dharavath Thanda, Dharavath Laxma(H) to Daravath Madhu(H) & D.Roop Singh(H) to Temple of GP. Narayanapuram

5.00

0.00

Progress

18

Kuravi

L/O CC Road at Bandamkommu Thanda, Mudu Sampath(H) to A.W.Centre of GP. Station Gundrathimadugu

5.00

0.00

Progress

19

Kuravi

BT to Road from Sudanapally to Chandya Thanda H/o Sudanapally

150.00

41.58

Progress

20

Kuravi

BT to Road from Kuravi R&B Road Eerya Thanda via Umla Thanda H/o Kuravi © of Umla Thanda

108.00

23.93

Progress

 

Sl. No

Name of the Mandal

Name of the Work

Estimate cost

Expenditure

Stage of work

22

Maripeda

L/o CC R/F Banoth Seelma (H) to Banoth Venkanna (H)  at Vatchya Thanda H/o  Burhanpuram

5.00

0.00

Progress

23

Maripeda

C/o Culvert & Side Drain from Banoth Seelma (H) to Banoth Bodiya (H) at Burhanpuram

5.00

0.00

Progress

24

Maripeda

C/o Culvert & Side Drain from Banoth Bavsingh (H) to Banoth Panthulya (H) at Burhanpuram

3.00

0.00

Progress

25

Maripeda

L/o CC Road at Megya Thanda, Boda Amarsingh (H) to Bhukya Lalu (H) at Anepuram (V)

5.00

0.00

Progress

26

Maripeda

L/o CC Road at Itikala Gadda thanda, Bhukya Balya (H) to Bhukya Sukya (H) at Anepuram (V)

5.00

0.00

Progress

27

Maripeda

L/o CC Road at BC colony Anjaneya bazar, Anjaneya swamy Temple to Kaki Veeranna (H) & R&B Road to T Prathapa Reddy (H) of Balane Dharamaram (V)

5.00

0.00

Progress

28

Maripeda

BT to R/F BT to Road from Maripeda to Makul thanda of  GP Maripeda

77.00

0.00

Progress

29

Maripeda

BT to R/F PWD Road to PWD Road via vagoddu thanda GP Maripeda

150.00

0.00

Progress

30

Maripeda

BT to R/F BT to Road from Venkatnaik thanda to Dubba thanda H/o Veeraram

91.00

0.00

Progress

31

Maripeda

BT to R/F Lunavath Thanda to Veeraram

166.00

0.00

Progress

32

Narsimhulapet

BT to Road from Datla to Laxmipuram of GP Datla

100.00

0.00

Progress

33

Narsimhulapet

Laying of CC Road in laxma thanda (J.Jamla (H) to J.Valya (H) of Jayapuram (v)

5.00

0.00

Progress

34

Narsimhulapet

BT to Road from Jayapuram to Basu thand H/o Jayapuram

65.00

0.00

Progress

35

Narsimhulapet

BT to Road from Khammam Highway Kothathanda to banjara of Gp Peddanagaram

75.00

0.00

Progress

36

Narsimhulapet

BT to Road from Khamama High way to PR Road Chilamma Cherla Via Mallammakunta Thanda, Tarasing thanda and hazathanda of    Gp Peddanagaram

150.00

0.00

Progress

37

Narsimhulapet

BT to Road from Pdanagaram to hanma thanda via gopathanda laudya thanda H/o Pedanagaram

130.00

0.00

Progress

38

Pedda vangara

C/o Hard Pasage from Oruganti Ramulu(H) to S.Ravinder Reddy (H) of                               Gp Peddanagaram

4.00

0.00

NS

39

Pedda vangara

C/o Bus Shelter at Chinnavangara

2.50

0.00

NS

40

Pedda vangara

C/o Compound Wall at Kabrasthan at Chitayala(V)

2.00

0.00

NS

 

Sl. No

Name of the Mandal

Name of the Work

Estimate cost

Expenditure

Stage of work

41

Pedda vangara

C/o Culvert Near Peddacheruvu

4.00

0.00

Progress

42

Pedda vangara

C/o Community Hall in SC Colony at Chityala

5.00

0.00

Progress

43

Pedda vangara

C/o Bus Shelter at Koripally

2.50

0.00

NS

44

Pedda vangara

C/o Hindhu Smashanavatika near Pedha Cheruvu at Koripelli(V)

4.00

0.00

Progress

45

Pedda vangara

C/o Bus Shelter in Peddavangara

2.50

0.00

NS

46

Pedda vangara

C/o Community Hall in Mera Wada at Peddavangara

5.00

0.00

NS

47

Pedda vangara

C/o Community Hall in  Peddavangara

5.00

0.00

NS

48

Pedda vangara

C/o Culvert at Hajuru Thanda at Peddavangara (V)

3.00

0.00

NS

49

Pedda vangara

L/o Community Hall at Uppari Colony at Upparigudem

5.00

0.00

Progress

50

Pedda vangara

C/o RO Water Plant in Chityala

5.00

0.00

NS

51

Pedda vangara

L/o Community Hall at S.C Colony at Upparagudem(V)

5.00

0.00

Progress

52

Pedda vangara

C/o Bus Shelter at Authapuram

2.50

0.00

NS

53

Pedda vangara

Providing Link  Road in Sarpanch thanda of Bommakal 

5.00

0.00

NS

54

Pedda vangara

L/o Internal C.C Road in New Housing Colony at Chityala (V)

4.00

0.00

NS

55

Pedda vangara

Providing BT Road from Bangaru Chelimi thanda to Suryathanda  of Chityala GP

20.00

0.00

Progress

56

Pedda vangara

L/o C.C Road From Kasani Uppalaiah(H) to Rasala Somaiah(H) at Gantlakunta (V)

4.00

0.00

Progress

57

Pedda vangara

L/o C.C Road From Chenna Prabhakar(H) to Kasani Veeranna(H) at Gantlakunta (V)

4.00

0.00

Progress

58

Pedda vangara

F/R From Mitta Tirmalreddy(H) to Muthyalamma Temple at Gantlakunta (V)

4.00

0.00

Progress

59

Pedda vangara

Internal CC Road in Gantlakunta

5.00

0.00

Progress

60

Pedda vangara

F/R From to Seetharamaswamy Temple to Padamati Thanda at Gantlakunta (V)

5.00

0.00

Progress

61

Pedda vangara

C/o Bus Shelter at Gantlakunta

2.50

0.00

Progress

62

Pedda vangara

L/o C.C Road From Lakavath Somla(H) to J Somani(H) at Gantlakunta(V)

3.00

0.00

Progress

63

Pedda vangara

F/R From PWD Road to Ramoji Thanda at Gantlakunta(V)

5.00

0.00

NS

64

Pedda vangara

Providing BT Road from Gantlakunta to Ramoju thanda of Gantlakunt   GP

30.00

0.00

Progress

 

Sl. No

Name of the Mandal

Name of the Work

Estimate cost

Expenditure

Stage of work

65

Pedda vangara

Providing Link Road from R&B Road to Shankar thanda of Koripally  GP  Bit – I

5.00

0.00

NS

66

Pedda vangara

C/o Bus Shelter at Pochampally

2.50

0.00

NS

67

Pedda vangara

Providing BT Road from Pochampally to PR Road Gantlakunta via Enameedi thanda of Pochampally  GP

30.00

0.00

Progress

68

Pedda vangara

C/o GP Building in Avuthapurm (V)

4.00

0.00

Progress

69

Pedda vangara

C/o GP Building in Pochampaly (V)

4.00

0.00

Progress

70

Pedda vangara

C/o GP Building in Bommakal (V)

4.00

0.00

Progress

71

Pedda vangara

C/o Compound wall to ZP Highschool at Bommakallu (V)

2.50

0.00

NS

72

Pedda vangara

F/R from Peddavangara to Hazuru thanda of GP Peddavangara

5.00

0.00

NS

73

Pedda vangara

C/o CD Work at Bustand Junction at Gantlakunta

5.00

0.00

NS

74

Pedda vangara

C/o Community Hall Near Durgamma Temple at Kanvaigudem

4.00

0.00

Progress

75

Pedda vangara

F/R From Peddavangara to Hazuru thanda Bit-I Peddavangara

5.00

0.00

NS

76

Pedda vangara

F/R From Peddavangara to Hazuru thanda Bit-II at Peddavangara

5.00

0.00

NS

77

Thorrur

C/o Community Hall in Mudiraj Colony at Madipelli (V)

5.00

0.00

Progress

78

Thorrur

C/o Community Hall in Gouda Colony at Madipelli (V)

4.00

0.00

Progress

79

Thorrur

C/o Plot Form and Compound Wall to Burial Ground at Cherlapalem (V)

4.00

0.00

NS

80

Thorrur

C/o G.P Building at Ammapuram (V)

3.00

0.00

Progress

81

Thorrur

C/o Community Hall in Gouda Colony Polepally (V)

5.00

0.00

Progress

82

Thorrur

C/o PR Sub-Division Office Building Bit -I at Thorrur (V)

5.00

0.00

Progress

83

Thorrur

C/o GP Buiding at Karkala (V)

4.00

0.00

NS

84

Thorrur

C/o GP Building at Khanapuram (V)

4.00

0.00

Progress

85

Thorrur

C/o Community Hall in Mudiraj Colony at Nancharimadur (V)

5.00

0.00

Progress

86

Thorrur

C/o Community Hall in S.C Colony at Nancharimadur (V)

5.00

0.00

Progress

87

Thorrur

C/o Community Hall Near Seetha Ramachandra swamy Temple at Somaram (V)

3.00

0.00

Progress

88

Thorrur

C/o Kitchen Room to Model School of Gurthur (V)

5.00

0.00

Progress

 

Sl. No

Name of the Mandal

Name of the Work

Estimate cost

Expenditure

Stage of work

89

Thorrur

C/o Additional accommodation to Junior College Bit-I of Thorrur (V)

5.00

0.00

Progress

90

Thorrur

C/o PR Sub-Division Office Building Bit -II of Thorrur (V)

5.00

0.00

Progress

91

Thorrur

C/o Bus Shelter at Ammapuram (V)

2.50

0.00

NS

92

Thorrur

C/o Community Hall at Budiga Jangala Colony Bit.II H/o Ammapurm (V)

5.00

0.00

Progress

93

Thorrur

L/o C.C Road From Guguloth Lakupathi(H) to G Bakkalu at Ammapuram (V)

3.00

0.00

Progress

94

Thorrur

L/o Internal CC Road in 2BHK Colony of Madipelli (V)

4.00

0.00

Progress

95

Thorrur

F/R/F Sub Station to Agrl.Land of Cherlapalem (V)

4.00

0.00

NS

96

Thorrur

C/o Community Hall in Padmashali Colony Bit.II of Cherlapalem (V)

5.00

0.00

NS

97

Thorrur

Providing Link Road from GopalPur to  Dubba thanda of Cherlapalem  GP  Bit-I

5.00

0.00

Progress

98

Thorrur

Providing Link Road from GopalPur to  Dubba thanda of Cherlapalem  GP Bit-II

5.00

0.00

Progress

99

Thorrur

Providing BT Road from R&B Road to Hachu thanda of Chinthalapally (V)

30.00

0.00

Progress

100

Thorrur

Providing BT Road from PR Road Chinthalapally to Kanpurya thanda of Chinthalapally GP

20.00

0.00

Progress

101

Thorrur

C/o Bus Shelter at Fathepuram (V)

2.50

0.00

NS

102

Thorrur

F/R From Shulala Colony to R&B Gunjedu Musalamma Road at Gurthur (V)

4.00

0.00

Progress

103

Thorrur

C/o Foot Bridge at Haripiral (V)

1.50

0.00

Progress

104

Thorrur

F/R From PR Road to Mudiraj Colony at Haripirala (V)

4.00

0.00

NS

105

Thorrur

F/R From Gadhala Colony to Thalari Colony at Haripirala (V)

4.00

0.00

NS

106

Thorrur

F/R From Gadhala Colony to Chikatayapalem at Haripirala (V)

4.00

0.00

NS

107

Thorrur

Providing BT Road from R&B Road to Bheemuni thanda of Haripirala GP

20.00

0.00

Progress

108

Thorrur

C/o Bus Shelter at Jamasthampuram ‘X’ Road of Jamasthanpuram (V)

2.50

0.00

NS

109

Thorrur

Providing BT Road from PR Road to Kasanathanda of Kantaiapalem GP

20.00

0.00

Progress

110

Thorrur

L/o C.C Road From Md Basheer(H) to Konda Komuraiah(H) at Kantayapalem (V)

4.00

0.00

Progress

 

Sl. No

Name of the Mandal

Name of the Work

Estimate cost

Expenditure

Stage of work

111

Thorrur

L/o C.C Road From SK Saidulu(H) to Itikala Somanarsaiah(H) at Kantayapalem (V)

3.00

3.00

Progress

112

Thorrur

Formation & Metaling From Kasna Thanda to Meetya Thanda  at Kantayapalem (V)

4.00

0.00

Progress

113

Thorrur

C/o Community Hall in Gouda Colony, Matedu  (V)

5.00

0.00

NS

114

Thorrur

Providing BT Road from Somarapukunta thanda (Madipelly to Chandru thanda of Polepally (V)

20.00

0.00

Progress

115

Thorrur

Providing Link Road from Jamasthanpuram to Sudarnayak Thanda of Somaram GP  Bit-I

5.00

0.00

NS

116

Thorrur

Providing Link Road from Jamasthanpuram to Sudarnayak Thanda of Somaram GP          Bit-II

5.00

0.00

NS

117

Thorrur

Providing BT Road from R&B Road to LB thanda via Dasru thanda of GP Thorrur

20.00

0.00

Progress

118

Thorrur

Providing BT Road from R&B Road to Seethya thanda via Deshai thand of Velikatte  GP

30.00

0.00

Progress

119

Thorrur

Providing BT Road from Erra Somla thanda to Teekya thand aof Velikatte  GP

60.00

0.00

Progress

 

  1. SDF (Palle Pragathi Programme):

Sl. No.

Name of the Mandal

Name of the Work

Estt. Cost.

Expendi-ture

Stage of Work

1

Mahabubabad

C/o Compound Wall to Primary School Building at Madhapuram(V)

3.00

0.00

Progress

2

Mahabubabad

L/o CC R/F Banoth Srinu(H) to Bhukya Murali(H) at GP Somla Thanda H/o Secunderabad Thanda GP

4.99

0.00

Completed

3

Mahabubabad

L/o CC R/F Gogula Uppalaiah(H) to Bontha Nagaiah(H) at Malyala(V)

4.99

0.00

Completed

4

Mahabubabad

L/o CC R/F Danda Venkayya(H) to Bandari Sathayya(H) & B.Mahender Reddy(H) at Mudupugal(V)

4.99

0.00

Completed

5

Mahabubabad

L/o CC R/F Gandasiri Sanjeeva(H) to Gunja Babu(H) at B.Laxmipuram(V)

4.95

0.00

Progress

6

Kesamudram

L/o CC R/F Nimmala Nagaraju(H) to Nalla Chinna Yadagiri(H) in Thallapusapally(V)

4.99

4.99

Completed

7

Kesamudram

L/o CC Road in Thallapusapally(V)

4.95

4.95

Completed

8

Nellikuduru

L/o CC R/F R&B Road to Kasturi Srinu(H) at Nellikuduru(V)

5.00

0.00

Completed

9

Nellikuduru

L/o CC R/F Veeragani Uppalaiah(H) to Kola Muthaiah(H) at Nellikuduru(V)

5.00

0.00

Completed

10

Dornakal

L/o CC R/F Bangaru Mysamma Gudi to Guduru Bixam(H) at Gollacherla(V)

4.90

0.00

Completed

11

Dornakal

L/o CC R/F Darla Muthaiah(H) to Pathakotla Venkanna(H) at Gollacherla(V)

4.90

0.00

Completed

12

Kuravi

L/o CC R/F Auto Adda to UP School at Gundrathimadugu(V)

5.00

0.00

Progress

13

Kuravi

L/o CC R/F Thokala Bixam(H) to R&B Road and Thangellapelly Venkanna(H) to R&B Road at Kothur(G)

5.00

0.00

Completed

14

Kuravi

L/o CC R/F Suraboina Lachaiah(H) to Primary School at Gundrathimadugu of GP Gundrathimadugu

5.00

0.00

Progress

15

Kuravi

L/o CC R/F R&B Road to Koyyagudem of GP Gundrathimadugu

5.00

0.00

Completed

16

Gudur

L/o CC R/F Gade Venkat Reddy (H) to Jagnu thanda in Jangu thanda (V)

4.95

4.89

Completed

17

Gudur

L/o CC R/F M Shenkar(H) to B. Somaiah(H) at Putlampodu thanda of Apparajpally (V)

4.95

4.92

Completed

 

Sl. No.

Name of the Mandal

Name of the Work

Estt. Cost.

Expendi-ture

Stage of Work

18

Gudur

L/o CC R/F Korlakunta Narsaiah(H) to Esam Venkanna(H) at Bodhugonda(V) of Gudur(M).

4.99

0.00

Completed

19

Gudur

L/o CC R/F Garipelly Mohan Rao(H) to Dussa bhadraiah(H) at Bodhugonda(V)

4.99

0.00

Completed

20

Gudur

L/o CC R/F Sri Ramoji Venkanna(H) to Kunta Yadagiri(H) at Bodhugonda(V)

4.99

0.00

Completed

21

Maripeda

F/R/F Gurrappa thanda to Akeru Vagu of Gurrappa Thanda(V)

5.00

0.00

Completed

22

Maripeda

Remuval of Trees, stones & Leveling with gravel at TS Model School at Maripeda (V)

2.00

1.92

Completed

TOTAL :                                               

104.53

21.67

 

                                                              

  1. C.D.P. (Constitueny Development Programme- Balance works) 2017-18 & 18-19 :

Sl. No.

Name of the Mandal

Name of the Work

Estt. Cost.

Expendi-ture

Stage of Work

1

Mahabubabad

L/o CC Road from Kamsali Muthaiah (H) to Kammari Krishna Murthy (H) at Amangal (V)

4.99

0.00

Meterial Collected

2

Gudur

Laying of CC Road in Gundenga (V)

4.99

0.00

Not Started

3

Gudur

Laying of CC Road at Line Thanda, Gudur (V)

4.99

0.00

Not Started

4

Kesamudram

C/o Road protection works near railway under bridge at Kesamudram Station (V)

4.99

0.00

Not Started

5

Kesamudram

L/o CC Road at Gandhinagar, Kalwala (V)

4.99

0.00

Not Started

6

 Nellikudur

C/o Community Hall at Alair (V)

2.50

0.00

Not Started

7

Maripeda

Construction of Compound wall at MLC Camp Office at Maripeda (V)

5.00

0.00

Meterial Collected

8

Chinnagudur

Construction of CC Road From R&B Road to Ananthula Mallaiah (H)  at Jayyaram (V)

5.00

0.00

Meterial Collected

9

Chinnagudur

Laying of CC Road from R&B Road to Culvert at  Chinnagudur(V)

2.00

0.00

Meterial Collected

10

Danthalapally

C/o IKP Building at Kummarikuntla (V)

5.00

0.00

Not Started

11

Danthalapally

C/o Community Hall at Budagajangam Colony Datla (V)

5.00

0.00

Not Started

12

Dornakal

Construction of Toilet Block in Masjid Road in Dornakal GP

5.00

0.00

Plastring in -Progress

13

Dornakal

C/o Kitchen Shed at Model school at Chilkodu

2.00

0.00

Not Started

14

Dornakal

C/o Fisheriesh Community Hal at Thodellagudem H/o Kannegundla GP

1.00

0.00

Not Started

15

Thorrur

L/o internal Road in Hachu Thanda GP

3.00

0.00

Meterial Collected

16

Thorrur

C/o Community Hall in SC Colony in Gurthur (V)

4.00

0.00

Not Started

17

Thorrur

C/o Community Hall GangaPuthra Colony in Gurthur (V)

4.00

0.00

Not Started

18

Thorrur

C/o Libarry Building in Kantayapalem

2.00

0.00

Not Started

19

Thorrur

C/o Community Hall in Vishunbramana Colony in Thorrur GP

4.00

0.00

Not Started

20

Peddavangara

L/o internal Road in Gantlakunta (V)

4.00

0.00

Meterial Collected

21

Peddavangara

C/o G.P.Building at Waddekothapalli (V)

5.00

0.00

Meterial Collected

22

Peddavangara

L/o internal Road in Kanvaigudem (V)

3.00

0.00

Meterial Collected

23

Peddavangara

L/o internal Road in Bavoji Thanda (V)

3.00

0.00

Meterial Collected

TOTAL :

89.45

0.00

 

 

  1. D.M.F. (DISTRICT MINERAL FOUNDATION TRUST ):

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

1

Kuravi

Improvements to R/F Nallela to Rajole PWD Road via Gajathanda (V)

54.00

0.00

wet mix Progress

2

Kuravi

Improvements to R/F Rayanipatnam X Road to Manchya Thanda via Elkachettu thanda (V)

54.00

0.00

CC-Completed, 400 Mtrs.

3

Kuravi

Improvements to R/F Seerole to Chilukoyyalapadu via Korla Kunta Thanda (V)

77.40

0.00

CC- Work in Progress

4

Kuravi

Improvements to R/F Beelya Nayak Thanda (Kampally) to Thalla Sankeesa via Bhukya Thanda (V)

61.20

0.00

CC-Completed

5

Kuravi

Improvements to R/F Kandikonda to Edjerla Road via Jatoth Thanda and BB Naik Thanda (V)

63.00

0.00

CC-Completed

6

Chinnagudur

Improvements to R/F Uggampally to Banjara Road  (V)

36.00

0.00

JC -C,  CD Works in -P

7

Maripeda

Improvements to R/F PWD Road at Gopa Thanda to Ajmeera Thanda via Chinthala Thanda, Errakunta Thanda H/o Peddanagaram (V)

108.00

0.00

Jungle clearence & CD work -C

8

Maripeda

Improvements to R/F. PWD Road to Mamilla Madhava X Road via Chillamcherla , Rampuram (V)

61.20

0.00

Not Started

9

Gudur

Improvements to R/F PWD Road to Dameravancha (V)

50.00

0.00

Progress

10

Gudur

Improvements to R/F Providing the BT R/F PWD Road to Kongaragidda (V)

110.00

0.00

Progress

11

Kesamudram

Improvements to R/F PWD Road to Upparapally thanda (V)

39.00

0.00

Progress

12

Kesamudram

PWD Road to Penugonda (V)

40.00

10.17

CC Road -C

13

Nellikudur

Improvements to R/F PWD Road to Ramannagudem (V)

24.00

0.00

Progress

14

Nellikudur

Improvements to R/F Rathiram Thanda to Kachikal Bus stage via Singya thanda (V)

50.00

0.00

Progress

15

Mahabubabad

Improvements to R/F PWD Road to Bodagutta thanda via Mutyalammagudem (V)

50.00

0.00

Not Started

 

Sl. No.

Mandal

Name of the work

Estimate cost

Expenditure

Status of work

16

Mahabubabad

Improvements to R/F Mangali colony (Mah’bad) to Nereda PWD Road

via Malyala, Manchya thanda(V)

180.00

0.00

Patch work is in -P

17

Kothaguda

Improvements to R/F Kothapally to Thimmapur (V)

100.00

0.00

Progress

18

Kothaguda

Improvements to R/F R&B Road to Cheruvumundu thanda (V)

40.00

0.00

Progress

19

Thorrur

PWD Road to Khanapur (V)

24.00

0.00

Progress

20

Thorrur

PWD Road to Polepally (V)

10.00

0.00

Progress

21

Thorrur

PWD Road to Cherlapalem (V)

28.00

0.00

Progress

22

Thorrur

PWD Road to Zamasthanpur (V)

16.00

0.00

Progress

23

Thorrur

PWD Road to Velikatte (V)

16.00

0.00

Progress

24

Peddavangara

Gantla Kunta to Kanvaigudem (V)

22.00

0.00

Progress

25

Peddavangara

PWD Road to Koripally (V)

40.35

0.00

Progress

26

Peddavangara

Kodakandla PR Road Rangapur X Road to Authapur via Rangapur, Gantlakunta, Pochampally (V)

213.72

0.00

Progress

27

Peddavangara

PWD Road to Waddekothapally (V)

62.00

0.00

Progress

28

Bayyaram

Improvements to R/F R&B Road to Patha Kambalapally via Suddarevu (V)

202.45

0.00

Jungle clearence -P

29

Garla

Improvements to R/F Pulluru ZP Road to BRN Thanda (V)

30.00

0.00

Jungle clearence -P

30

Garla

Improvements to R/F Pathapocharam to Kothapocharam (V)

24.00

0.00

Jungle clearence -P

31

Garla

Improvements to R/F Garla to Jeevanchupally (V)

35.00

0.00

Jungle clearence -P

Total

1921.32

10.17

 

 

  1. C.B.F. (CRUCIAL BALANCE FUND):

Sl. No.

Name of the Mandal

Name of the Work

Estt. Cost.

Expen diture

Stage of Work

1

Mahabubabad

R/F Thallapusapally R&B Road to Youth Training Centre (Temporary Collector Office) Mahabubabad (V)

18.00

14.14

Completed

2

Mahabubabad

C/o Compound Wall arround the proposed SP Office near Sub-Jail in Mahabubabad (V)

15.00

14.61

Completed

3

Mahabubabad

Spl. Repairs, Children logos and painting to the Anganwadi Centre at Shanigapuram (V)

1.00

1.00

Completed

4

Mahabubabad

Spl.Repairs and Children’s logo paints in Anganwadi Building in Ayodhya (V)

1.00

0.81

Completed

5

Mahabubabad

Balance work, Spl. Repairs and Children’s Logos paints to Anganwadi Building -2 at Shenigapuram (V)

2.00

1.42

Completed

6

Mahabubabad

Formation & Gravelling to the Road Sub-Jail to Kendriya Vidyalayam Open land at Mahabubabad (V)

4.95

4.65

Completed

7

Mahabubabad

Balance work L/o CC Road from Sub-Jail to Kendriya Vidyalayam Open land at Mahabubabad (V).

4.99

4.99

Completed

8

Mahabubabad

Formation & Gravelling to the R/F Dharmanna Colony Road to Kasthuribha Gandhi (Girls) School at Mahabubabad (V)

3.00

2.47

Completed

9

Mahabubabad

L/o CC R/F Dharmanna Colony Road to Kasthuribha Gandhi (Girls) School at Mahabubabad (V)

3.00

2.32

Completed

10

Mahabubabad

L/o CC R/F SP Office to Kendriya Vidyalaya at Mahabubabad (V)

4.99

4.99

Completed

11

Mahabubabad

L/o CC R/F Approach Road to Kendriya Vidyalaya at Mahabubabad (V).

4.99

4.99

Completed

12

Mahabubabad

C/o New Disstricct Library Building at Mahabubabad (V)

30.00

29.00

Completed

13

Mahabubabad

C/o Compound Wall for Indian Red Cross society blood Bank, Mahabubabad at Mahabubabad town

1.00

0.98

Completed

14

Mahabubabad

C/o CC Road wearing Coat from R&B (Check Post) to Burra Venkanna(H) Jamandlapally(V)

5.00

5.00

Completed

15

Mahabubabad

Spl. Repairs to R/F R&B Road Edulapusapally to Kommugudem, H/o B.Laxmipuram via Soniagandhi Thanda & Laxmipuram(V)

2.00

2.00

Completed

16

Mahabubabad

Spl. Repairs to Addl. (3) Class Rooms of kendriya Vidyalayam at Mahabubabad (V)

2.00

0.00

Progress

17

Nellikuduru

C/o Cause Way from Brahmanakothapally(V) to Srihari Thanda and Chandru Thanda GP

15.00

11.53

Completed

18

Nellikuduru

Spl.Repairs and Children’s logo paints in Anganwadi Building in Nellikudur (V)

1.00

0.76

Completed

19

Nellikuduru

B/W C/o of PHC Blding at Munigalaveedu (V)

2.50

2.50

Completed

20

Nellikuduru

Special Repairs to Kasturiba Gandhi Residential School at Nellikudur (V)

1.00

0.00

N.S.

21

Nellikuduru

C/o Compound Wall to MPUPS School at  Narsimmhulagudem(V) 

4.00

4.00

Completed

 

Sl. No.

Name of the Mandal

Name of the Work

Estt. Cost.

Expen diture

Stage of Work

22

Nellikuduru

C/o Compound Wall to Anganwadi School (Towads TankBund) at Narsimhulagudem(V)

4.50

4.50

Completed

23

Nellikuduru

Spl.Repairs and Children’s logo paints in Anganwadi Building in Nellikudur (V)

1.00

0.76

Completed

24

Nellikuduru

B/W C/o of PHC Building at Munigalaveedu (V)

2.50

2.50

Completed

25

Nellikuduru

Special Repairs to Kasturiba Gandhi Residential School at Nellikudur (V)

1.00

0.00

N.S.

26

Nellikuduru

C/o Compound Wall to MPUPS School at  Narsimmhulagudem(V) 

4.00

4.00

Completed

27

Nellikuduru

C/o Compound Wall to Anganwadi School (Towads TankBund) at Narsimhulagudem(V)

4.50

4.50

Completed

28

Gudur

Spl.Repairs and Children’s logo paints in Anganwadi Building Chandrugudem (V)

1.00

0.73

Completed

29

Gudur

L/o Internal CC R/F Perumandla Ramulu (H) to Kanjerla Doodaiah(H) at Ponugodu(V)

4.99

3.52

Completed

30

Gudur

L/o Internal CC R/F Muthyalamma Temple to Kathi Krishna(H) at Ponugodu(V)

4.99

3.30

Completed

31

Dornakal

L/o CC Road at Thodellagudem H/o Kannegundla(V)

5.00

4.99

Completed

32

Dornakal

L/o CC R/F Kota Mysamma Gudi to Venkateshwara Temple In Vennaram (V)

5.00

5.00

Completed

33

Dornakal

L/o CC R/F Garla Appaiah(H) to Aili Venkanna(H) in Gollacherla(V)

5.00

5.00

Completed

34

Dornakal

L/o CC R/F Kodavandla Lachaiah(H) to Pathakotla Lingaiah(H) in Gollacherla(V)

5.00

4.59

Completed

35

Dornakal

Spl. Repairs, Children logos and painting to the Anganwadi Centre at Ammapalem (V)

1.00

0.98

Completed

36

Dornakal

Formation of Gravel R/F Balapala R&B Road to Chinthakunta village via Gollacherla(V)

4.99

4.98

Completed

37

Kuravi

Spl.Repairs and Children’s logo paints in Anganwadi Building in Kampally (V)

1.00

0.73

Completed

38

Kuravi

C/o CC Road in Vasram thanda H/o Thalla Sankeesa(V)

5.00

5.00

Completed

39

Maripeda

C/o Culverts & Internal Roads in Burahanpuram(V)

3.90

0.00

Completed

40

Maripeda

L/o CC R/F Gaddam Nagi Reddy(H) to Nallabolu Sathi Reddy(H) at Burhanpuram(V)

2.00

1.90

Completed

 

Sl. No.

Name of the Mandal

Name of the Work

Estt. Cost.

Expen diture

Stage of Work

41

Maripeda

L/o CC Road near K.Rathnakar Reddy at Burhanpuram(V)

0.60

0.00

Completed

42

Maripeda

F/o R/F Banoth Hari(H) to Chinna Kuntaat Burhanpuram(V)

1.00

0.00

Completed

43

Maripeda

F/o R/F Alugu to Chinthala Venkanna land of Burhanpuram(V)

1.50

0.00

Completed

44

Maripeda

C/o CC Road in Bhanjara Thanda H/o Neelikurthy(V)

5.00

0.00

Completed

45

Maripeda

Proiding LED Street Lights in Bavojigudem(V)

4.99

3.96

Completed

46

Maripeda

Proiding LED Street Lights and Poles from Byroju Eshwaramma(H) to Thatikonda Sudhakar(H) in Burhanpuram(V)

5.00

0.00

Progress

47

Maripeda

Proiding LED Street Lights and Poles from Nallabolu Prathap Reddy(H) to Byroju Ramachandraiah(H) in Burhanpuram(V)

5.00

0.00

Completed

48

Maripeda

Metaling Road from Byroju Ramachandraiah(H) to Gaddam Mohan Reddy Stone Wall(H) in Burhanpuram(V)

1.40

0.00

Completed

49

Maripeda

Metaling Road from DWACRA Building to Maramma Temple in Burhanpuram(V)

0.60

0.00

Completed

50

Maripeda

Providing 60w LED Street Lights in GP of Parkajala thanda GP

5.00

0.00

Completed

51

Maripeda

Providing 60w LED Street Lights in GP of Neelikurthy (V)

5.00

0.00

Completed

52

Maripeda

Providing 60w LED Street Lights in Munya thanda, Dasya Thanda & Rekya thanda of GP Neelikurthy

5.00

0.00

Completed

53

Maripeda

Providing 60w LED Street Lights in GP of Bavojigudem

5.00

0.00

Completed

54

Maripeda

C/o Community Hall in SC Colony, Burhanpuram(V)

5.00

0.00

Progress

55

Maripeda

C/o Gram Panchayat Building at Burhanpuram(V)

5.00

0.00

Progress

56

Narsimhula pet

Spl.Repairs and Children’s logo paints in Anganwadi Building in Narsimhulapet (V)

1.00

0.81

Completed

 

 

Sl. No.

Name of the Mandal

Name of the Work

Estt. Cost.

Expen diture

Stage of Work

57

Kothaguda

Spl. Repairs to R/F Phakala Tank Weir to Gudi Thanda and Gundam Gudi Thanda to Keerya Thanda of Gundam (V)

5.00

5.00

Completed

58

Kothaguda

Spl.Repairs and Children’s logo paints in Anganwadi Building in Yedullapally (V)

1.00

0.80

Completed

59

Kothaguda

Special Repairs and Children’s logo paints in Anganwadi Building at Polaram (V)

1.60

0.00

Completed

60

Kothaguda

Special Repairs and Children’s logo paints in Anganwadi Building at Emchaguda  (V)

1.00

0.82

Completed

61

Kothaguda

Special Repairs and Children’s logo paints in Anganwadi Building at Konapur (V) H/o Sadireddypally

1.00

0.82

Completed

62

Kothaguda

Special Repairs and Children’s logo paints in Anganwadi Building at Yellapur (V)

1.00

0.00

N.S.

63

Kothaguda

Special Repairs and Children’s logo paints in Anganwadi Building at Jangalapally (V)

1.00

0.00

Completed

64

Gangaram

Spl.Repairs and Children’s logo paints in Anganwadi Building in Thirumalagandi (V)

1.00

0.00

Completed

65

Bayyaram

C/o Slab Culvets at Vattam PadmaRao (H) in Motlathimmapuram H/o Ramachandrapuram GP

3.00

2.70

Completed

66

Bayyaram

Spl. Repairs, Children logos and painting to the Anganwadi Centre at Namalapadu (V)

1.00

0.99

Completed

67

Bayyaram

Maintenance of PHC Ward Buildings at Bayyaram(V)

10.00

10.00

Completed

68

Bayyaram

Maintenance of PHC Sub-Centre, Quarters and Compound Wall at Bayyaram(V)

10.00

9.94

Completed

69

Bayyaram

Spl. Repairs to Anganwadi Building at Motlathimmapuram in Ramachandrapuram GP

1.00

1.00

Completed

70

Garla

Spl.Repairs and Children’s logo paints in Anganwadi Building in Pulluru (V)

1.00

0.74

Completed

71

Thorrur

Spl.Repairs and Children’s logo paints in Anganwadi Building in Thorrur (V)

1.00

0.81

Completed

72

Thorrur

L/o Internal CC Road in SC Colony in Haripirala(V)

4.99

4.99

Completed

73

Thorrur

L/o Internal CC Road in BC Locality-I in Haripirala(V)

4.99

4.99

Completed

74

Thorrur

L/o CC Road in Bojya Thanda H/o Velikatte (V)

4.99

4.91

Completed

75

Thorrur

Spl. Repairs to (03) Rooms School Building in PS Gurthur (V)

1.60

1.60

Completed

76

Thorrur

C/o Kitchen Shed in PS Gurthur (V)

2.75

2.75

Completed

77

Thorrur

C/o Toilet Block in PS Gurthur (V)

2.00

2.00

Completed

78

Thorrur

Supply & Fixing of Playing Equipments in PS Gurthur (V)

2.00

0.00

N.S.

79

Thorrur

Gardening and supply of Cement Benches in PS Gurthur (V)

0.50

0.00

N.S.

80

Thorrur

Supply of Duel Desks to PS Gurthur (V)

3.70

0.00

N.S.

81

Peddavangara

Spl.Repairs and Children’s logo paints in Anganwadi Building in Chityala (V)

1.00

0.81

Completed

 

 

GRAND TOTAL

319.48

232.42

 

  1. RYTHU VEDIKA WORK SHEDS:

Sl. No.

Name of the Mandal

Name of the Rythu Vedika work shed

Estt. Cost.

Expen diture

Stage of Work

 

1

Dornakal

Chilukodu

22.00

21.39

completed

 

2

Dornakal

Ammapalem

22.00

18.210

completed

 

3

Dornakal

Gollacherla

22.00

20.19

completed

 

4

Dornakal

Vennaram

22.00

17.93

completed

 

5

Dornakal

Mannegudem

22.00

18.39

completed

 

6

Kuravi

Balapala

22.00

19.58

completed

 

7

Kuravi

Nerada

22.00

20.08

completed

 

8

Kuravi

Modugulagudem

22.00

20.09

completed

 

9

Kuravi

Kampally

22.00

18.69

completed

 

10

Kuravi

Gundrathimadugu

22.00

20.47

completed

 

11

Kuravi

Thallasankeesa

22.00

18.39

completed

 

12

Kuravi

Ayyagaripalli

22.00

17.05

completed

 

13

Kuravi

 Sudanpally

22.00

18.62

completed

 

14

Kuravi

Kuravi

22.00

17.28

completed

 

15

Maripeda

Purushothamayagudem

22.00

19.21

completed

 

16

Maripeda

Lachya Thanda

22.00

16.48

completed

 

17

Maripeda

Thanamcherla

22.00

17.82

completed

 

18

Maripeda

Bhurhanpur

22.00

21.19

completed

 

19

Maripeda

Chillamcherla

22.00

16.23

completed

 

20

Maripeda

Abbaipalem

22.00

18.27

completed

 

21

Maripeda

Neelikurthy

22.00

20.02

completed

 

22

Maripeda

Giripuram

22.00

18.60

completed

 

23

Maripeda

Veeraram

22.00

18.99

completed

             

 

Sl. No.

Name of the Mandal

Name of the Rythu Vedika work shed

Estt. Cost.

Expenditure

Stage of Work

24

Maripeda

Yellampet

22.00

20.59

completed

25

Chinnagudur

Jayyaram

22.00

18.47

completed

26

Chinnagudur

Uggampalli

22.00

17.60

completed

27

Narsimhulapet

Peddanagaram

22.00

18.70

completed

28

Narsimhulapet

Narsimhulapet

22.00

18.75

completed

29

Narsimhulapet

Jayapuram

22.00

19.92

completed

30

Danthalapally

Gunnepalli

22.00

17.55

completed

31

Danthalapally

Peddamupparam

22.00

20.64

completed

32

Danthalapally

Danthalapally

22.00

18.21

completed

33

Kesamudram

Penugonda

22.00

17.36

completed

34

Kesamudram

Inugurthy

22.00

15.72

completed

35

Kesamudram

Upparapalli

22.00

17.67

completed

36

Kesamudram

Kalwala

22.00

17.87

completed

37

Kesamudram

Kesamudram

22.00

16.52

completed

38

Kesamudram

Mahamudpatnam

22.00

16.33

completed

39

Gudur

Bhupathipet

22.00

19.02

completed

40

Gudur

Ponugodu

22.00

15.18

completed

41

Gudur

Gudur

22.00

17.62

completed

42

Gudur

Boddugonda

22.00

18.73

completed

43

Gudur

Gundenga

22.00

13.74

completed

44

Thorrur

Kantaipalem

22.00

18.68

completed

45

Thorrur

Nancharimadur

22.00

19.15

completed

 

Sl. No.

Name of the Mandal

Name of the Rythu Vedika work shed

Estt. Cost.

Expenditure

Stage of Work

46

Thorrur

Ammapuram

22.00

16.88

completed

47

Thorrur

Matedu

22.00

16.59

completed

48

Thorrur

Haripirala

22.00

18.27

completed

49

Thorrur

Thorrur Urban

22.00

11.85

completed

50

Peddavangara

Chityala

22.00

17.30

completed

51

Peddavangara

Avuthapuram

22.00

18.57

completed

52

Peddavangara

Peddavangara

22.00

18.27

completed

 

 

GRAND TOTAL

1144.00

944.92

 

 

  1. CREMATORIUMS:

Sl. No.

Name of the Mandal

Name of the Grama Panchayat

Estt. Cost.

Expenditure

Stage of Work

1

Maripeda

Abbaipalem

12.60

0.01

Progress

2

Maripeda

Ajmeera Thanda

12.60

0.01

Progress

3

Maripeda

Amrunaik Thanda

12.60

5.42

Completed

4

Maripeda

Anepuram

12.60

0.01

Progress

5

Maripeda

Balni Dharmaram

12.60

0

Progress

6

Maripeda

Balya Thanda

12.60

6.09

Completed

7

Maripeda

Bavojigudem

12.60

0

Progress

8

Maripeda

Beechrajpalle

12.60

6.05

Completed

9

Maripeda

Bhukya Thanda

12.60

5.84

Completed

10

Maripeda

Botya Thanda

12.60

3.3

Progress

11

Maripeda

Burhanpuram

12.60

0.01

Progress

12

Maripeda

Burki Thanda

12.60

0.01

Progress

13

Maripeda

Chillamcherla

12.60

5.85

Progress

14

Maripeda

Chinthalagadda Thanda

12.60

4.82

Progress

15

Maripeda

Dhantlakunta Thanda

12.60

7.04

Completed

16

Maripeda

Dharavath Thanda

12.60

0

Progress

17

Maripeda

DSR Jandala Thanda

12.60

2.12

Progress

18

Maripeda

Edjerla

12.60

0.01

Progress

19

Maripeda

Giripuram

12.60

0.01

Progress

20

Maripeda

Gurrappa Thanda

12.60

0.01

Progress

21

Maripeda

Kotya Thanda

12.60

2.1

Progress

22

Maripeda

Lachya Thanda

12.60

0

Progress

23

Maripeda

Laxma Thanda

12.60

0.01

Progress

24

Maripeda

Lunavath Thanda

12.60

6.14

Completed

25

Maripeda

Mulamarri Thanda

12.60

0

Progress

26

Maripeda

Neelikurthy

12.60

2.59

Progress

27

Maripeda

Nethavath/ Parkajala Thanda

12.60

0

Progress

28

Maripeda

Pambada Thanda

12.60

0.01

Progress

29

Maripeda

Purushothamayagudem

12.60

6.14

Completed

30

Maripeda

Rampuram

12.60

0.01

Progress

31

Maripeda

Somla Thanda

12.60

3.94

Progress

32

Maripeda

Stage Thanda

12.60

3.91

Progress

33

Maripeda

Thanda Dharmaram

12.60

0.01

Progress

34

Maripeda

Ullepally

12.60

6.01

Progress

35

Maripeda

Valya Thanda

12.60

5.97

Completed

36

Maripeda

Veeraram

12.60

3.88

Progress

37

Maripeda

Venkampad

12.60

0

Progress

38

Maripeda

Venkatiya Thanda

12.60

0.01

Progress

39

Maripeda

Yelamancha Thanda

12.60

2.45

Progress

40

Chinnaguduru

Pagidipally

12.60

6.54

Completed

41

Chinnaguduru

Gundamrajpally

12.60

6.08

Completed

42

Chinnaguduru

Chinnagudur

12.60

5.03

Completed

43

Chinnaguduru

Mangoligudem

12.60

4.36

Progress

44

Chinnaguduru

Mannegudem

12.60

0

Progress

45

Chinnaguduru

Megya Thanda

12.60

4.2

Progress

46

Chinnaguduru

Vissampally

12.60

0

Progress

47

Chinnaguduru

 Thummala Chervu Thanda

12.60

5.93

Completed

48

Chinnaguduru

Uggampally

12.60

0

Completed

49

Narsimhulapeta

Bakka Thanda

12.60

4.21

Progress

50

Narsimhulapeta

Boduka Thanda

12.60

6.89

Completed

51

Narsimhulapeta

Bojjannapeta

12.60

2.71

Progress

52

Narsimhulapeta

Jayapuram

12.60

1.82

Progress

53

Narsimhulapeta

Kommulawancha

12.60

6.81

Progress

54

Narsimhulapeta

Kowsalyadevipalle

12.60

8.41

Completed

55

Narsimhulapeta

Mungimadugu

12.60

3.33

Progress

56

Narsimhulapeta

Padamatigudem

12.60

1.72

Progress

57

Narsimhulapeta

Peddanagaram

12.60

0

Progress

58

Narsimhulapeta

Ramannagudem

12.60

3.2

Progress

59

Narsimhulapeta

Roopla Thanda

12.60

2.49

Progress

60

Danthalapalli

Bherishettigudem

12.60

3.89

Progress

61

Danthalapalli

Kummarikuntla

12.60

0.01

Progress

62

Danthalapalli

Thoorputhanda

12.60

5.97

1

63

Kuravi

Ayyagaripalle

12.60

6.52

Completed

64

Kuravi

Bancharayi Thanda

12.60

0.02

Progress

65

Kuravi

Bhilya Naik Thanda

12.60

0.01

Progress

66

Kuravi

Buruguchettu Thanda

12.60

2.12

Progress

67

Kuravi

Bangarigudem

12.60

0.01

Progress

68

Kuravi

Beebinayak Thanda

12.60

0.01

Progress

69

Kuravi

Chimla Thanda

12.60

2.59

Progress

70

Kuravi

Chinthapally

12.60

3.83

Progress

71

Kuravi

Chandya Thanda

12.60

2.45

Progress

72

Kuravi

Elukuchettu Thanda

12.60

3.88

Progress

73

Kuravi

Gaja Thanda

12.60

2.13

Progress

74

Kuravi

Gopa Thanda

12.60

0.01

Progress

75

Kuravi

Gundrathimadugu

12.60

0.00

Not started

76

Kuravi

Haridas Thanda

12.60

2.77

Progress

77

Kuravi

Jagya Thanda

12.60

2.56

Progress

78

Kuravi

Kakulaboduthanda(K’L

12.60

3.98

Progress

79

Kuravi

Kancharlagudem

12.60

0.01

Progress

80

Kuravi

Kampally thanda

12.60

0.00

Not started

81

Kuravi

Kandikonda

12.60

0.01

Progress

82

Kuravi

Kothur C

12.60

0.01

Progress

83

Kuravi

Kothuru G

12.60

0.01

Progress

84

Kuravi

Korlakunta Thanda

12.60

3.26

Progress

85

Kuravi

Kuravi

12.60

0.01

Progress

86

Kuravi

Lingya Thanda K

12.60

0.01

Progress

87

Kuravi

Lingya Thanda B

12.60

4.01

Progress

88

Kuravi

Nallella

12.60

2.32

Progress

89

Kuravi

Narayanapuram

12.60

0.01

Progress

90

Kuravi

Nerada

12.60

4.38

Progress

91

Kuravi

Pedda Thanda

12.60

2.16

Progress

92

Kuravi

Padamati Thanda  (Rekula Thanda S)

12.60

1.98

Progress

93

Kuravi

Rajole

12.60

5.29

Progress

94

Kuravi

Rekula Thanda K

12.60

0.01

Progress

95

Kuravi

Sudhanapally

12.60

6.08

Progress

96

Kuravi

Thattupalle

12.60

0.01

Progress

97

Kuravi

Thatya Thanda

12.60

5.38

Completed

98

Kuravi

Thirumalapuram

12.60

0.01

Progress

99

Kuravi

Thulsiya Thanda

12.60

5.28

Progress

100

Kuravi

Vasram Thanda

12.60

0.01

Progress

101

Kuravi

Zuzur Thanda

12.60

6.89

Progress

102

Kuravi

Polampally Thanda

12.60

4.73

Progress

103

Dornakal

Ammapalem

12.60

0.01

Progress

104

Dornakal

Ravigudem

12.60

2.13

Progress

105

Dornakal

Andalapadu

12.60

3.97

Progress

106

Dornakal

Banjara

12.60

0.01

Progress

107

Dornakal

Thellabandathanda

12.60

2.32

Progress

108

Dornakal

Bodraithanda

12.60

3.5

Completed

109

Dornakal

Burugupadu

12.60

2.96

Progress

110

Dornakal

Chapla thanda

12.60

3.76

Completed

111

Dornakal

Chilkodu

12.60

0

Progress

112

Dornakal

Chilkoyalapadu

12.60

0.01

Progress

113

Dornakal

Dubbathanda

12.60

2.47

Progress

114

Dornakal

Fakeera thanda

12.60

3.9

Progress

115

Dornakal

Gollacherla

12.60

2.11

Progress

116

Dornakal

Gurralakunta thanda

12.60

0

Not started

117

Dornakal

Hunyathanda

12.60

0

Progress

118

Dornakal

Jogya thanda

12.60

3.85

Progress

119

Dornakal

Kannegundla

12.60

2.02

Progress

120

Dornakal

Limbyathanda

12.60

3.95

Progress

121

Dornakal

Kasnathanda

12.60

0.01

Progress

122

Dornakal

Kothadubbathanda

12.60

3.93

Progress

123

Dornakal

Mallaikuntathanda

12.60

3.85

Progress

124

Dornakal

Mannegudem

12.60

3.84

Progress

125

Dornakal

Modugaddathanda

12.60

2.31

Progress

126

Dornakal

Perumalla sankeesa

12.60

2.64

Progress

127

Dornakal

Ramu thanda

12.60

2.99

Progress

128

Dornakal

Thodellagudem

12.60

0.01

Progress

129

Dornakal

Uyyalawada

12.60

2.77

Progress

130

Dornakal

Vennaram

12.60

5.21

Progress

131

Dornakal

Mulkalapally

12.60

2.36

Progress

132

Dornakal

Patha Dubba Thanda

 12.60

0

Not started

133

Mahabubabad

Amanagal

12.60

2.65

Progress

134

Mahabubabad

Ayodhya

12.60

2.16

Progress

135

Mahabubabad

Balaram Thanda

12.60

0.01

Progress

136

Mahabubabad

 Bodagutta Thanda

12.60

0.01

Progress

137

Mahabubabad

Chekya Thanda

12.60

1.96

Progress

138

Mahabubabad

Chinnakistapur

12.60

2.22

Progress

139

Mahabubabad

Danya Thnada

12.60

0

Progress

140

Mahabubabad

Darga Thanda

12.60

2.56

Progress

141

Mahabubabad

Donga Thanda (Yerradevla Thanda)

12.60

2.43

Progress

142

Mahabubabad

Gaddigudem

12.60

3.98

Completed

143

Mahabubabad

Gundalagadda Thanda

12.60

0.01

Progress

144

Mahabubabad

Hazarya Thanda

12.60

4.7

Progress

145

Mahabubabad

 Indira Nagar Colony

12.60

1.94

Progress

146

Mahabubabad

Islavath Thanda(M)

12.60

0

Progress

147

Mahabubabad

Islavath Thanda(S)

12.60

2.44

Progress

148

Mahabubabad

Jangiligonda

12.60

2.15

Progress

149

Mahabubabad

Jarpula Thanda

12.60

2.32

Progress

150

Mahabubabad

Kevula Thanda

12.60

2.4

Progress

151

Mahabubabad

Laxmipur

12.60

2.4

Progress

152

Mahabubabad

Laxmipur Thanda (Hazarya )

12.60

2.56

Progress

153

Mahabubabad

Laxma Thanda

12.60

4.64

Progress

154

Mahabubabad

Madhavapur

12.60

3.15

Progress

155

Mahabubabad

Malyal

12.60

4.22

Progress

156

Mahabubabad

Mekala Thanda

12.60

4.11

Completed

157

Mahabubabad

Mudupugal

12.60

7.64

Completed

158

Mahabubabad

Nadiwada

12.60

5.09

Completed

159

Mahabubabad

Regadithanda

12.60

0

Progress

160

Mahabubabad

Redyala

12.60

1.88

Progress

161

Mahabubabad

Rotibanda Thanda

12.60

2.23

Progress

162

Mahabubabad

Saduthanda

12.60

5.02

Progress

163

Mahabubabad

Sandrallagudem

12.60

5.54

Completed

164

Mahabubabad

 Secundera bad Thanda

12.60

2.83

Completed

165

Mahabubabad

 Seetha Thanda

12.60

7.44

Completed

166

Mahabubabad

Singaram

13.60

0.01

Progress

167

Mahabubabad

Somla Thanda

12.60

4.98

Progress

168

Mahabubabad

Thurupu Thanda

12.60

0.01

Progress

169

Mahabubabad

Uttara Thanda

12.60

2.97

Progress

170

Mahabubabad

V.S Laxmipuram

12.60

5.05

Progress

171

Mahabubabad

 Vemunur

12.60

2.22

Progress

172

Kesamudram

Ameenapur

12.60

0.02

Progress

173

Kesamudram

Annaram

12.60

0.02

Progress

174

Kesamudram

Arpanapale

12.60

6.65

Completed

175

Kesamudram

Ayyagaripalli

12.60

0.01

Progress

176

Kesamudram

Baranigadda Thanda

12.60

4.65

Progress

177

Kesamudram

Beechanaik Thanda

12.60

3.35

Progress

178

Kesamudram

Beriwada

12.60

0.02

Progress

179

Kesamudram

Bhukya Ram Thanda

12.60

0.01

Progress

180

Kesamudram

Boda Manchya Thanda

12.60

0.01

Progress

181

Kesamudram

Camp Thanda

12.60

2.46

Progress

182

Kesamudram

Cheenyathanda

12.60

0.01

Progress

183

Kesamudram

Dhanasari

12.60

4.02

Progress

184

Kesamudram

Dharmaram Thanda

12.60

0

Progress

185

Kesamudram

Gandhinagar

12.60

2.72

Progress

186

Kesamudram

Harichandra Thanda

12.60

2.48

Progress

187

Kesamudram

Inugurthy

12.60

2.46

Progress

188

Kesamudram

Katrepalli

12.60

2.08

Progress

189

Kesamudram

Kesamudram

12.60

2.7

Progress

190

Kesamudram

Komatipalli

12.60

0

Progress

191

Kesamudram

Korukondapalle

12.60

1.72

Progress

192

Kesamudram

Lalu Thanda

12.60

0.01

Progress

193

Kesamudram

Mahamoodpatnam

12.60

0.01

Progress

194

Kesamudram

Mangya Thanda

12.60

5.17

Progress

195

Kesamudram

Narsimhulagudem

12.60

3.91

Progress

196

Kesamudram

Peddamori Thanda

12.60

0.02

Progress

197

Kesamudram

Peekla Thanda

12.60

2.42

Progress

198

Kesamudram

Rangapuram

12.60

3.06

Progress

199

Kesamudram

S.T.Colony

12.60

5.92

Progress

200

Kesamudram

Sappidgutta Thanda

12.60

0

Progress

201

Kesamudram

Sarwapuram Thanda

12.60

0

Progress

202

Kesamudram

Tallapusapally

12.60

5.09

Progress

203

Kesamudram

Tarasingh Thanda

12.60

5.98

Completed

204

Kesamudram

Upparapalle

12.60

0.02

Progress

205

Kesamudram

Venkatagiri

12.60

2.94

Progress

206

Kesamudram

Zptc Thanda

12.60

0

Progress

207

Nellikuduru

Badi Thanda

12.60

7.1

Completed

208

Nellikuduru

 Banjara

12.60

3.69

Progress

209

Nellikuduru

Botimeedi thanda

12.60

7.18

Completed

210

Nellikuduru

chinnanagaram

12.60

0

Progress

211

Nellikuduru

Durgabhavani Thanda

12.60

0.01

Progress

212

Nellikuduru

hanuman Thanda

12.60

2.07

Progress

213

Nellikuduru

Hemla Thanda

12.60

5.19

Progress

214

Nellikuduru

Jama thada\

12.60

4.3

Completed

215

Nellikuduru

 Laxipuram

12.60

4.56

Progress

216

Nellikuduru

 Madanathurthi

12.60

4.42

Progress

217

Nellikuduru

Meetya Thanda

12.60

2.99

Progress

218

Nellikuduru

Munugaveedu

12.60

1.94

Progress

219

Nellikuduru

Nainala

12.60

2.51

Progress

220

Nellikuduru

Nallagutta Thanda

12.60

2.69

Progress

221

Nellikuduru

 Narsimhulagudem

12.60

1.55

Progress

222

Nellikuduru

 Nellikuduru

12.60

6.97

Completed

223

Nellikuduru

Parvathamagudem

12.60

2.88

Progress

224

Nellikuduru

Pedda Thanda

12.60

3.84

Progress

225

Nellikuduru

 Peddamattithanda

12.60

0

Progress

226

Nellikuduru

Ragya Thanda

12.60

0

Progress

227

Nellikuduru

Rajulakothapalli

12.60

1.9

Progress

228

Nellikuduru

Ramannagudem

12.60

1.37

Progress

229

Nellikuduru

 Rathiram Thanda

12.60

0.01

Progress

230

Nellikuduru

 Ravirala

12.60

2.73

Progress

231

Nellikuduru

Sandhya Thanda

12.60

2.74

Progress

232

Nellikuduru

Seetaharampuram

12.60

0

Progress

233

Nellikuduru

soulla Thanda

12.60

6.58

Completed

234

Nellikuduru

Sreeramagiri

12.60

2.25

Progress

235

Nellikuduru

Vasuram Thanda

12.60

2.33

Progress

236

Nellikuduru

 Vavilala

12.60

2.96

Progress

237

Nellikuduru

Yerrabelligudem

12.60

7.64

Completed

238

Thorrur

Bojya Thanda

12.60

2.08

Progress

239

Thorrur

Amarsingh Thanda

12.60

2.48

Progress

240

Thorrur

Teekya Thanda

12.60

3.53

Progress

241

Thorrur

Kommanapally Thanda

12.60

4.91

Progress

242

Thorrur

Hachu Thanda

12.60

4.29

Progress

243

Thorrur

Zamasthanpuram

12.60

5.45

Completed

244

Thorrur

Somaram

12.60

0

Progress

245

Thorrur

Somarapukunta Thanda

12.60

0

Progress

246

Thorrur

Fathepuram

12.60

3.35

Progress

247

Thorrur

Matedu

12.60

2.23

Progress

248

Thorrur

Cherlapalem

12.60

1.96

Progress

249

Thorrur

Gopalagiri

12.60

3.44

Progress

250

Thorrur

Venkatapuram

12.60

2.26

Progress

251

Thorrur

Dubba Thanda

12.60

2.5

Progress

252

Thorrur

Peddamangya Thanda

12.60

2.97

Completed

253

Thorrur

Karkala

12.60

2.26

Progress

254

Thorrur

Nancharimadur

12.60

1.66

Progress

255

Thorrur

Velikatte

12.60

0

Progress

256

Thorrur

Gudibanda Thanda

12.60

2.91

Progress

257

Thorrur

G.K. Thanda

12.60

1.76

Progress

258

Peddavangara

Bavoji Thanda

12.60

3.96

Progress

259

Peddavangara

BC Thanda

12.60

3.16

Progress

260

Peddavangara

Padamati Thanda

12.60

3.77

Progress

261

Peddavangara

Chinnavangara

12.60

2.11

Progress

262

Peddavangara

Lotla Banda Thanda

12.60

1.61

Progress

263

Peddavangara

Mothya thanda

12.60

2

Progress

264

Peddavangara

Upparigudem

12.60

1.82

Progress

265

Peddavangara

Chityala

12.60

0

Progress

266

Peddavangara

Kanvaigudem

12.60

0

Progress

267

Peddavangara

Gantla Kunta

12.60

0.03

Progress

268

Peddavangara

Pocharam

12.60

0.02

Progress

269

Peddavangara

Waddekothapally

12.60

2.83

Progress

270

Peddavangara

Rajman sing Thanda

12.60

0

Progress

271

Peddavangara

RC Thanda

12.60

0.04

Progress

272

Peddavangara

Reddy Kunta Thanda

12.60

0

Progress

273

Garla

BUDDARAM

12.60

0

Progress

274

Garla

SATYANARAYANAPURAM

12.60

0.01

Progress

275

Garla

PR GUDEM

12.60

0.01

Progress

276

Garla

RAJU THANDA

12.60

4.00

Completed

277

Garla

MARRIGUDEM

12.60

6.34

Progress

278

Garla

BRN THANDA

12.60

3.99

Completed

279

Garla

PULLURU

12.60

3.6

Progress

280

Garla

GOPALAPURAM

12.60

0

Progress

281

Garla

CHINNABANJARA

12.60

2.44

Progress

282

Garla

POCHARAM

12.60

2.63

Progress

283

Garla

KOTYNAIKTHANDA

12.60

4.2

Progress

284

Garla

BALAJITHANDA

12.60

0.01

Progress

285

Garla

RAMPURAM

12.60

0.01

Progress

286

Garla

MADDIVANCHA

12.60

0.01

Progress

287

Garla

MULKANUR

12.60

2.78

Progress

288

Garla

CHINNAKISTAPURAM

12.60

0

Progress

289

Garla

PEDDAKISTAPURAM

12.60

0.01

Progress

290

Garla

SEETHAMPETA

12.60

3.87

Progress

291

Garla

SERIPURAM

12.60

4.47

Completed

292

Bayyaram

Alligudem

12.60

0

Progress

293

Bayyaram

Balajipeta

12.60

3.94

Progress

294

Bayyaram

Balya Thanda

12.60

5.43

Completed

295

Bayyaram

Charlapalli

12.60

2.76

Progress

296

Bayyaram

Gowraram

12.60

4.37

Progress

297

Bayyaram

Gurimella

12.60

4.82

Progress

298

Bayyaram

Irsulapuram

12.60

8.23

Completed

299

Bayyaram

Isukamedi

12.60

4.27

Progress

300

Bayyaram

Jagathraopeta

12.60

3.85

Progress

301

Bayyaram

Jagguthanda

12.60

0

Progress

302

Bayyaram

Kachanapalli

12.60

0.01

Progress

303

Bayyaram

Kambalapalli

12.60

0

Progress

304

Bayyaram

Kasthuri Nagaram

12.60

0.01

Progress

305

Bayyaram

Kotagadda

12.60

7.14

Completed

306

Bayyaram

Kothagudem

12.60

4.65

Progress

307

Bayyaram

Kothapeta

12.60

0

Not started

308

Bayyaram

Koyagudem

12.60

3.51

Progress

309

Bayyaram

Miryalapenta

12.60

5.6

Completed

310

Bayyaram

Motlathimmapuram

12.60

5.44

Progress

311

Bayyaram

Namalapadu

12.60

4.39

Progress

312

Bayyaram

Narayanapuram

12.60

0

Progress

313

Bayyaram

Narsa Thanda

12.60

0

Not started

314

Bayyaram

Ramachandra Puram

12.60

0

Progress

315

Bayyaram

Santhulalpodu Thanda

12.60

3.71

Progress

316

Bayyaram

Singaram

12.60

0.01

Progress

317

Bayyaram

Uppalapadu

12.60

3.37

Progress

318

Bayyaram

Venkatapuram

12.60

0

Progress

319

Gangaram

Bavurugonda

12.60

0

Progress

320

Gangaram

Chintagudem

12.60

3.37

Progress

321

Gangaram

Dubbagudem

12.60

0.01

Progress

322

Gangaram

Gangaram

12.60

2.38

Progress

323

Gangaram

Jangalapally

12.60

0

Progress

324

Gangaram

Kamaram

12.60

3.5

Progress

325

Gangaram

Kodishilamitta

12.60

2.55

Progress

326

Gangaram

Komatlagudem

12.60

3.41

Progress

327

Gangaram

Madagudem

12.60

3

Progress

328

Gangaram

Ponugondla

12.60

3.52

Progress

329

Gangaram

Thirumalagandi

12.60

2.8

Progress

330

Gangaram

Marrigudem

12.60

3.48

Progress

331

Kothaguda

Bathulapally

12.60

0.01

Progress

332

Kothaguda

Durgaram

12.60

2.22

Progress

333

Kothaguda

Enchagudem

12.60

4.14

Progress

334

Kothaguda

Gopalpur

12.60

2.4

Progress

335

Kothaguda

Govindapur

12.60

4.96

Progress

336

Kothaguda

Gundam

12.60

2.95

Progress

337

Kothaguda

Gunjedu

12.60

0

Progress

338

Kothaguda

Jangavanigudem

12.60

3.01

Progress

339

Kothaguda

Karlai

12.60

2.03

Progress

340

Kothaguda

Konapur

12.60

3

Progress

341

Kothaguda

Kothaguda

12.60

4.68

Progress

342

Kothaguda

Kothapally

12.60

0.01

Progress

343

Kothaguda

Mondraigudem

12.60

4.68

Progress

344

Kothaguda

Pegadapally

12.60

0.01

Progress

345

Kothaguda

Ramannagudem thanda

12.60

4.78

Progress

346

Kothaguda

Musmi

12.60

3.07

Progress

347

Kothaguda

Renya thanda

12.60

0.00

Not started

348

Kothaguda

Sadireddypally

12.60

4.4

Progress

349

Kothaguda

Thativarivempally

12.60

0.01

Progress

350

Kothaguda

Velubelly

12.60

2.6

Progress

351

Kothaguda

Cheruvumundu thanda

12.60

4.62

Progress

352

Kothaguda

Pogulapally

12.60

3.5

Progress

353

Gudur

Apparajpally

12.60

5.41

Progress

354

Gudur

Ayodhyapur

12.60

0.01

Progress

355

Gudur

Bhupathipet

12.60

1.27

Progress

356

Gudur

Boddugonda

12.60

4.28

Progress

357

Gudur

Bollepally

12.60

1.62

Progress

358

Gudur

Brahamana Thanda

12.60

1.39

Progress

359

Gudur

Chakruthanda

12.60

7.02

Completed

360

Gudur

Chinnayellapur

12.60

1.62

Progress

361

Gudur

Chirrakunta Thanda

12.60

1.4

Progress

362

Gudur

Dameravancha

12.60

3.84

Progress

363

Gudur

Dubbagudem

12.60

0

Progress

364

Gudur

Epur Thanda

12.60

5.9

Progress

365

Gudur

Gundenga

12.60

0

Progress

366

Gudur

Hanumathanda

12.60

2.43

Progress

367

Gudur

Jaganayakulagudem

12.60

2.41

Progress

368

Gudur

Kobal Thanda

12.60

3.27

Progress

369

Gudur

Kollapur

12.60

6.4

Completed

370

Gudur

Laxmipur Thanda

12.60

0

Progress

371

Gudur

Linethanda

12.60

3.22

Progress

372

Gudur

Macharla

12.60

3.1

Progress

373

Gudur

Marrimitta

12.60

0.83

Progress

374

Gudur

Naikpallyy

12.60

5.73

Progress

375

Gudur

Ootla

12.60

6.67

Progress

376

Gudur

Padamati Thanda

12.60

2.1

Progress

377

Gudur

Patimeedi Thanda

12.60

5.47

Progress

378

Gudur

Rajanpally

12.60

0.01

Progress

379

Gudur

Ramulathanda

12.60

7.22

Progress

380

Gudur

Seethanagaram

12.60

3.07

Progress

381

Gudur

Tejavath Ram Singh Thanda

12.60

3.12

Progress

382

Gudur

Vemgampet

12.60

3.01

Progress

 

TOTAL :

 

4813.20

 

959.51

 

 

             

 

  1. C.C. ROADS 19-20 (MGNREGS):

Sl.            No

Mandal

No. Of  GP’s Sanctioned works

No of Works sanctioned in the mandal

Estt.Cost in Lakhs

Expenditure .in Lakhs

WORK STATUS

IN PROGRESS

COMPLE- TED

NOT STARTED

1

Chinnaguduru

4

21

110

75.26

3

15

3

2

Danthalapally

5

32

160

104.2

7

22

3

3

Dornakal

8

22

110

13.63

9

4

9

4

Kuravi

28

74

370

114.72

15

29

30

5

Maripeda

10

77

405

180.64

5

38

34

6

Narsimhulapet

4

19

95

56.63

4

13

2

7

Kesamudram

24

78

375

140.25

21

35

22

8

Mahabubabad

40

147

644

144.48

12

39

96

9

Nellikudur

29

110

440

36.57

9

19

82

10

Peddavangara

20

98

429.5

306.27

3

78

17

11

Thorrur

29

124

540

326.14

4

91

29

12

Bayyaram

13

45

185

73.1

16

18

11

13

Garla

19

38

211

80.91

6

22

10

 

TOTAL :

233

885

4074.5

1652.8

114

423

348

 

  1. G.P. BUILDINGS 2016-17 :

Sl No

Name of the Mandal

Name of the Gram Panchayat

Estt. Cost

Expenditure incurred

Status of work

1

Peddavangara

Avuthapuram

16.00

9.61

Completed

2

Peddavangara

Gatlakunta

16.00

 0.00

Site Problem

3

Peddavangara

Peddavangara

16.00

14.20

Completed

4

Peddavangara

Pochampalli

16.00

8.88

Completed

5

Peddavangara

Vadde-kothapalli

16.00

 0.00

Not Started (Taken up in other grant)

6

Thorrur

Bommakal

16.00

14.04

Completed

7

Thorrur

Cherlapalem

16.00

0.00 

Foundation level

8

Thorrur

Chikatayepalem

16.00

 0.00

Site Problem

9

Thorrur

Chinnavangara

16.00

 0.00

Not Started

10

Thorrur

Chinthalapalli

16.00

14.01

Completed

11

Thorrur

Fathepur

16.00

 0.00

Site Problem

12

Thorrur

Gurthur

16.00

 0.00

Site Problem

13

Thorrur

Kantayapalem

16.00

5.67

Roof Laid

14

Thorrur

Karkala

16.00

10.62

Completed

15

Thorrur

Khanapur

16.00

9.38

Slab laid

16

Thorrur

Nancharimadur

16.00

 0.00

Site Problem

17

Thorrur

Polepalli

16.00

5.62

Roof Laid

18

Thorrur

Venkatapuram

16.00

 0.00

Site Problem

19

Nellikudur

Brahamakothapalli

16.00

14.22

Roof Laid

20

Nellikudur

Kachikal

16.00

 0.00

Not started

21

Nellikudur

Nainala

16.00

15.19

Completed

22

Nellikudur

Chinnanagaram / Rathiram Thanda

16.00

 0.00

Not Started ( Alternate Praposals)

23

Nellikudur

Rajulakothapalli

16.00

 0.00

Site Problem

24

Nellikudur

Aleru

16.00

10.64

Roof Laid

25

Nellikudur

Narsimhulagudem

16.00

14.06

Completed

26

Nellikudur

Madanathurthy

16.00

10.83

Roof Laid

27

Nellikudur

Nellikudur

16.00

14.29

Completed

28

Nellikudur

Ravirala

16.00

4.65

Roof Level

29

Narsimhulapeta

Beerishettigudem

16.00

9.93

Roof Laid

30

Mahabubabad

Amanagal

16.00

11.09

Completed

31

Mahabubabad

Bethole

16.00

11.48

Completed

32

Mahabubabad

Laxmipuram

16.00

7.04

Roof Laid

33

Mahabubabad

Mudupugal

16.00

 0.00

Roof Level

34

Mahabubabad

Nadiwada

16.00

11.37

Completed

35

Mahabubabad

Parvathagiri

16.00

6.04

Roof Laid

36

Mahabubabad

Vemunoor

16.00

 0.00

Roof Level

37

Mahabubabad

Rajalipeta

16.00

7.74

Completed

38

Mahabubabad

VS Laxmipur

16.00

7.26

Completed

39

Maripeda

Abbaipalem

16.00

 0.00

Site Problem ( alternate Required)

40

Maripeda

Edjerla

16.00

5.84

Roof Level

41

Maripeda

Gundepudi

16.00

7.10

Roof Level

42

Maripeda

Purushothamayagudem

16.00

14.15

Completed

43

Maripeda

Balinidharmaram

16.00

 0.00

Site Problem

44

Maripeda

Uggampalli

16.00

13.48

Completed

45

Maripeda

Thallaookal

16.00

14.20

Completed

46

Maripeda

Burhanpuram

16.00

10.81

Roof Laid

47

Maripeda

Anepuram

16.00

8.15

Roof Laid

48

Maripeda

Chillamcherla

16.00

 0.00

Site Problem

49

Kuravi

Modugulagudem

16.00

8.79

Roof Laid

50

Kuravi

Thallasankeesa

16.00

11.92

Completed

51

Kuravi

Seerole

16.00

 0.00

Not Started

52

Kuravi

Mogilicherla

16.00

13.69

Completed

53

Kuravi

Gundrathimadugu (V)

16.00

 0.00

Technical Problems  Not Started

54

Kuravi

Kothuru (G)

16.00

 0.00

Site Problem

55

Kuravi

Thirumalapuram

16.00

12.94

Completed

56

Kesamudram

Intikanne

16.00

14.03

Completed

57

Kesamudram

Kesamudram (V)

16.00

11.12

Roof Laid

58

Kesamudram

Korukondapalli

16.00

 0.00

Site Problem

59

Kesamudram

Penugonda

16.00

 0.00

Site Problem

60

Kesamudram

Upparapalli

16.00

14.00

Completed

61

Kesamudram

Danasari

16.00

 0.00

Site Problem

62

Gudur

Boddigonda

16.00

 0.00

Basement Level

63

Gudur

Bhupathipeta

16.00

7.11

Roof Level

64

Gudur

Govindapur

16.00

 0.00

Foundation level

65

Gudur

Madanapuram

16.00

11.46

Roof Liad

66

Gudur

Kollapur

16.00

 0.00

Plinth Bheem Level

67

Gudur

Ponugodu

16.00

12.63

Completed

68

Gudur

Theegalaveni

16.00

 0.00

Flinth Beem Level

69

Gudur

Ramuluthanda

16.00

 0.00

Roof Level

70

Dornakal

Vennaram

16.00

 0.00

Site Problem

71

Dornakal

Banjara

16.00

 0.00

Site Cleared

72

Dornakal

Burugupahad

16.00

 0.00

Site Problem

73

Dornakal

Ravigudem

16.00

9.03

Roof Laid

74

Dornakal

Andanalapadu

16.00

 0.00

Site Problem

75

Dornakal

Chilukoyalapadu

16.00

 0.00

Site Problem

76

Dornakal

Perumandlasankeesa

16.00

 0.00

Site Problem

 

 

TOTAL

1216.00

448.31

 

 

  1. Anganwadi buildings (Incomplete) :

Sl. No

Name of the mandal

Name of the GP where bldg is sanctioned

Estimate Cost

Expenditure

Present Status

1

Garla

Buddaram

4.00

0.00

Progress

2

Garla

Pulluru

4.00

3.66

Completed

3

Garla

Marrigudem

3.00

2.67

Completed

4

Garla

Marrigudem

3.50

2.91

Completed

5

Bayyaram

Kambalapalli

4.00

3.80

Completed

TOTAL :

18.50

13.04