Close

ROADS AND BUILDINGS

 GOVERNMENT OF TELANGANA ROADS & BUILDINGS DEPARTMENT:

Roads are the life-line of nation providing transportation facility over the length and breadth of country. Systematic development of road is one of the important pre-requisites for development and acceleration of Socio-economic growth of the Country. Among the different modes of transportation systems, road transport carries more than 80 percent of the Goods and Passenger traffic. The network of roads, particularly from villages to town/cities facilitates speedy movement of goods and services and ensures higher growth trends, social integrity and well-being of the society. The productivity and efficiency of Road transport is directly linked with the availability and quality of Road network.

Roads and Buildings Department, Telangana State, came into existence on 02-06-2014, on formation of Telangana State. The Operations of the department are conducted, in the name and authority of the Governor of Telangana. The Minister for Roads & Buildings in the State Cabinet is responsible to the State Legislature relating to the works of the Department.

The Department strives to provide efficient, affordable, customer-focused, environmentally sustainable integrated transportation solutions, connecting villages, towns, cities and centers of industry, commerce, tourism and pilgrimage across the State. The department constructs and maintains roads and bridges on all roads under its control.

In Telangana State, the road assets of R&B Dept. comprises of 24,245 kms of road length with 3,152 kms of State Highways, 12,079 kms of Major District Roads, and 9,014 kms of Other District Roads. 16 National Highways are passing through the State of Telangana covering a length of 2,690 kms, out of which 868 kms are with National Highways Authority of India (NHAI). Ministry of Road Transport, Highways and Shipping, Government of India provides complete financial support for the development and maintenance of National Highways under the control of the department.

R&B Department, Telangana is also responsible for construction and maintenance of Government Buildings of various State Government Departments aggregating to 54.50 lakhs square feet area (Non-Residential Buildings – 13.13 lakhs Sq.fts and Residential Buildings – 41.37 lakhs Sq.fts) and acts as the custodian of State Government Buildings and the appurtenant lands. 

  • VISION

    1.  To provide 4-lane Roads leading to State Capital from District Head Quater.

    2.  To provide 2-lane Roads leading to all District Head Quater from Mandals.

    3.  Reconstruction of all weak Bridges and Widening of Narrow Bridges.

    4.  Construction of ROB’s/RUB’s in lieu of existing Level Crossings with the approval of the Railway Board.

    5.  To eliminate black spots by improving the Geometrics of the existing roads.

 

 

 PROGRESS OF ALL WORKS:  

SR & CRN:

S.

No.

District

Constituency

Name of the Work

Amount of Estimate Rs. Lakhs

Agency

Date of Commenc ement

Agreed date of Completion

Remarks

(A) MDR Non Plan

 

 

 

 

 

 

1

Mahabubabad

Yellandu

Improvements to PWD road to PWD road (via) ST colony SC colony and Satyanarayanapuram road from km 0/0 to 3/6 in Mahabubabad district

197.00

M/s Ganesh Builders, Khammam

24.11.2017

23.05.2018

 work not yet started

2

Mahabubabad

Yellandu

Repair and Rehabilitation of HLB (RCC 11V of 13.0 m span) at Km 12/4-8 of Mahabubabad-Yellandu road in Mahabubabad district

60.00

 

 

 

Tenders under process

 

 

 

Total

257.00

 

 

 

 

(B) MDR PLAN 

 

 

 

 

 

 

1

Mahabubabad

Dornakal

Improvement to Uggampally to Vissampally road from Km. 0/0 to 8/0 in Warangal District (Newly formed Mahabubabad District)

660.00

Sri N. Ramchandra Reddy, Mahabubabad

24.09.2018

31.10.2020

Work is completed

2

Mahabubabad

Dornakal

Improvement to Kummarikuntla – Narsimhulapet road from km 12/5-15/5  in  Mahabubabad District

300.00

 

 

 

Tetenders to be re called

3

Mahabubabad

Yellandu

Construction of HLB at Km 6/0-4 on Bayyaram – Muthyalammagudem road in Mahabubabad Dist (including widening of the road from km 5/8 to 11/2)

900.00

Sri Y. Ankeenedu Prasad, Khammam

09.10.2019

08.10.2020

Work is in progress

 

 

 

Total

1860.00

 

 

 

 

(C) Mandal Headquarters to District Headquarters 

 

 

 

1

Mahabubabad

Mulugu

Widening of Single lane to Double lane roads to connecting Mandal Head Quarters to District Head Quarters of Yellandu – Pakhal Road Km.48/0 to 59/1 in Warangal District.

1350.00

M/s Sri Matha Constructions, Hanamkonda

25.01.2016

24.10.2016

Proposals for diversion of forest land is under process.

 

 

 

Total

1350.00

 

 

 

 

 

 

 

Grand Total

3467.00

 

 

 

 

 

Status of DMF Works in R&B Division, Mahabubabad                                                                             
                 

S.

No.

District Constituency Name of the Work Amount of Estimate Rs. Lakhs Agency Date of Commenc ement Agreed date of completion Remarks
  (A) Matching Grant works              
1 Mahabubabad Mahabubabad/Dornakal/ Mulugu

Periodical Renewals to

1) Mahabubabad to Dornakal road from Km 6/0 to 8/1,

 2) Purshottamaya gudem to Yellampeta road from Km1/2 to 4/05,

 3) Kesamudram to Nellikudur road from Km 0/0 to 2/6 & 10/5 to 11/0 and

 4) Yellandu-Pakhal road from Km 33/0 to 36/0 & 40/4 to 42/0 in Mahabubabad District.

221.00       Tenders to be re called
2 Mahabubabad Dornakal Periodical Renewals to Suryapet-Nimmikal-Dhanthalapally from km 36/4 to 46/5 in  Mahabubabad District 387.00 M/s Sujana Constructions. 20.02.2019 19.08.2019 Work completed. 
      Total Rs: 608.00        
  (B) New works sanctioned by Collector, Mahabubabad              
1 Mahabubabad Mulugu Periodical Renewals to Yellandu – Pakhal road from Km  31/0 to 33/0 in Mahabubabad District. 34.00       Tenders to be re called
2 Mahabubabad Mulugu Periodical Renewals to Kothaguda – Sadireddypally road from Km 5/8 to 8/0 in Mahabubabad District 36.00       Tenders to be re called
3 Mahabubabad Mahabubabad Periodical Renewals to PWD road to  Nellikuduru Road via Sub-Division from Km  0/040-1/6 in Mahabubabad District. 45.30 Sri G. Praveen Reddy 19.02.2020 18.05.2020 Work completed. 
4 Mahabubabad Mahabubabad

Periodical Renewals to Gudur to Kesamudram road from Km  3/0 – 16/6 in Mahabubabad District                                                           ( In appropriate reaches ).

                             

52.75 M/s. Sai Narasimha Constructions 11.02.2020 10.05.2020 Work yet to be started
5 Mahabubabad Mahabubabad

Periodical Renewals to Mahabubabad to Nellikudur road from Km .3/0 – 26/6 in Mahabubabad District  ( In appropriate reaches ).

                             

159.20 SriS.Venkat Reddy 29.02.2020 28.08.2020 Work completed. 
6 Mahabubabad Mahabubabad Periodical Renewals to Kuravi to Yellandu X road via Anantharam from Km 9/8 – 12/100 in Mahabubabad  District. 26.50 Sri G. Praveen Reddy 19.02.2020 18.05.2020 Work completed. 
7 Mahabubabad Mahabubabad Providing CC Pavement from Km 17/700 – 18/170 of Mahabubabad – Kesamudram road in Mahabubabad District. 72.00 M/s. Sai Narasimha Constructions 25.02.2020 24.08.2020 Work completed. 
8 Mahabubabad Yellandu Periodical Renewals to Bayyaram – Mutyalammagudem road via Laxminarasimhapuram from Km 0/0 – 1/0 in Mahabubabad  District. 25.00 Sri M.Harsa Vardhan Reddy, Khammam 19.02.2020 18.08.2020 Work yet to be started
9 Mahabubabad Palakurthy Periodical Renewals to Thorrur – Haripirala road from Km 0/0 – 9/2 in Mahabubabad  District. 175.00 M/s. Sai Narasimha Constructions 19.02.2020 18.08.2020 Work yet to be started
10 Mahabubabad Dornakal

Periodical Renewals to Gollacherla to Mulkalapally road from Km 0/0 – 14/0 in Mahabubabad District ( In appropriate reaches ).

                             

88.00 M/s Sujana Constructions 19.02.2020 18.08.2020 Work completed. 
11 Mahabubabad Dornakal

Periodical Renewals to Ayyagaripally to Mannegudem road from Km 8/0 – 13/8 in Mahabubabad District.

                             

49.00 Sri M.Harsa Vardhan Reddy 19.02.2020 31.01.2021 work is in progress.
12 Mahabubabad Dornakal Periodical Renewals to Mahabubabad to Yellampet road from Km 9/0 – 18/900 in Mahabubabad District( In appropriate reaches ).                   75.00 M/s  Sai Narasimha Constructions 19.02.2020 18.08.2020 Work completed. 
      Total Rs: 837.75        
      Total Rs: 1445.75        

 

Status of LWE Works in R&B Division, Mahabubabad

S.

No.

District Constituency Name of the Work Amount of Estimate Rs. Lakhs Agency Date of Commenc ement Agreed date of completio n Remarks
1 Mahabubabad Mulugu Construction of BT road from Gunjedu – Dubbaguda (Kothaguda – Dubbaguda road ) from Km 0/0 to 40/0 (Via) Ladaigadda, Musmi, Karnagadd,Ponugandla, Ramaram, Lingala & Mamidigudem in Mahabubabad District 3982.34 Sri N. Ramachandra Reddy, Mahabubabad 03.02.2020 02.02.2022 Proposals for diversion of forest land under process.
   Total 3982.34        

 

S.

No.

District Constituency Name of the Work Amount of Estimate Rs. Lakhs Agency Date of Commenc ement Agreed date of completio n Remarks
1 Mahabubabad Yellandu ROB at LC No 90 between Garla and Dornakal on Kazipet-Vijayawada section 8000.00 M/S VSRK Constructions, Vissannapeta, Krishna District. 06.03.2020 05.09.2023 land aquisition under process.
2 Mahabubabad Mahabubabad ROB at LC No 80 between Tadalapusapalli and Mahabubabad on Kazipet-Vijayawada section 5845.76       GAD is awaited from Railway authorities.
3 Mahabubabad Mahabubabad Regrading of existing approaches – Construction of RUB in lieu of LC No 81 at the Railway Km 437/13-15 of Kazipet to Vijayawada section in Km 0/4 of Mahabubabad to Maripeda road in Mahabubabad Disrtict. 250.00 Sri Gade Praveen Reddy, Mahabubabad 26.03.2020 31.03.2021 Work is to be started
   Total: 14095.76        

 

STATUS OF INTEGRATED DISTRICT OFFICES COMPLEX WORK IN (R&B) DIVISION :: MAHABUBABAD

SI.

No.

District Constituency Name of the Work Amount of Estimate Rs. Lakhs Agency Date of Commencement Agreed date of completion Remarks
1 Mahabubabad Mahabubabad Construction of Integrated District Offices Complex and Residential Quarters – Pakage V – ( Jayasankar, Bhoopalpally, Warangal Rural and Mahabubabad District). 4908.00 M/s. KMV Projects Pvt. Ltd, Hyderabad 06.11.2017 30.09.2020 Work is in progress
   Total 4908.00        

 

Status of Inspection Bungalow in R&B Division, Mahabubabad

SI.

No.

District Constituency Name of the Work Amount of Estimate Rs. Lakhs Agency Date of Commencement Agreed date of completion n Remarks
1 Mahabubabad Mahabubabad Construction of Two Suited Inspection Bungalow at Mahabubabad in Mahabubabad District 100.00       Tenders to be re called
  Total 100.00        

 

Status of Ware House for EVMs & VVPATs in R&B Division, Mahabubabad

SI.

No.

District Constituency Name of the Work Amount of Estimate Rs. Lakhs Agency Date of Commenc ement Agreed date of completion Remarks
1 Mahabubabad Mahabubabad Construction of Ware House for starage of EV’s & VVPATs at Mahabubabad in Mahabubabad District. 115.00 Sri R. Sudarshan 30.10.2019 29.04.2020 work is in progress
  Total 115.00        

 

                                        STATEMENT SHOWING THE EMPLOYEES WORKING IN O/o DISTRICT (R&B) OFFICER, (EXECUTIVE ENGINEER)  MAHABUBABAD DISTRICT

     

Sl.

No.

Sanction Strength

Working Strength

Vacant

Last Name

First Name

Designation

Section

Mobile No.(10 digit Numbers)

Preferred Email Id/Login ID**(Name based)

Remarks

 
 

1

2

3

4

5

6

7

8

11

13

17

 

Distrioct(R&B) Office Mahabuabad

 

1

1

1

0

Gudipudi

Taneshwar

I/c Executive Engineer

  —

9440818084

eerbmahbad@gmail.com

  —

 

2

1

1

0

Ajmeera

 Rama

P.A to Executive Engineer (Dy.EE)

  —

9491044926

ramaajmeera3gmail.com

  —

 

3

2

0

2

  —

  —

AEE/Aes

  —

  —

  —

  —

 

4

1

0

1

Lingam

Srinivas

Technical Officer

  —

9959675556

srinivaskuda@gmail.com

On Deputation to work in District (R&B) Office, Mahabubabad

 

5

1

1

0

Kummari

Venkateshwarlu

Assistant Technical Officert

  —

9701474731

venkeyk130@gmail.com

  —

 

6

2

1

1

Nimmala

Sathyanarayana

Junior Technical Officer

  —

8639543376

nimmalasathi65@gmail.com

  —

 

7

1

1

0

Paka

 Nagaiah

DAO (W)

  —

9440819233

pakanagesh87@gmail.com

  —

 

8

1

1

0

Gangadhar

Narender

Superintendent

  —

9849527916

gangadharanarender19@gmail.com

On Deputation to Work in E-In-Chief (R&B) Admn & Q.C. Hyderabad on working arrangement basis

 

9

3

3

0

Pantaganti

 Jagadeeshwar

Senior Assistant

  —

8639096752

  —

  —

 

10

Vallem

Srinivas

 -do-

  —

9989417567

srinivasvallem567@gmail.com

  —

 

11

Valadasi

Durga Rao

 -do-

  —

9640116077

durgaraovaladasi5333@gmail.com

  —

 

12

3

3

0

Sam,ba Raju

Srinivas

Junior Assistant

  —

9849125819

  —

On Deputation to Work in S.E. (R&B) Regional Office, Warangal on working arrangement basis

 

13

Gummalla

 Kranthi Kumar

 -do-

  —

9676959687

kranthimsscc@gmail.com

  —

 

14

Banoth

Srinivas

 -do-

  —

6281953568

Banothsrinivas12@gmail.com

On Deputation to Work in District (R&B) Office, Warangal Urban on working arrangement basis

 

15

1

1

0

Dubasi

Linga Murthy

Record Assistant

  —

7330975227

  —

  —

 

16

5

5

0

Badi

Aruna

Office Subordinate

  —

8331815603

  —

  —

 

17

Kunamalla

Manoj

Office Subordinate

  —

9640517703

  —

On Deputation to Work in DEE (R&B) Sub Division, Narsampet under control of District (R&B) Office, Warangal rural on working arrangement basis

 

18

Dasari

 Vijay Kumar

 -do-

  —

9493130115

  —

  —

 

19

Mohd

 Yakubee

Office Subordinate

  —

8142326389

  —

  —

 

20

Palepangu

 Sathaiah

 -do-

  —

9705082298

  —

  —

 

21

2

0

2

  —

  —

Typist

  —

  —

  —

  —

 

22

1

0

1

  —

  —

Watchman

  —

  —

  —

  —

 

(R&B) Sub Division Mahabubabad

 

23

1

1

0

Pogaku

 Rajendra

Dy. Executive Engineer

  —

9440818407

deerb.mbad@gmail.com

  —

 

24

6

6

0

Khaja Mouzam

 Khaja Mouzam Ali Ansari

Asst. Executive Engineer

Keasmudram

9966919655

mouzamali.ansari@gmail.com

  —

 

25

Banothu

Anil Kumar

Asst. Executive Engineer

Bayyaram

8499097946

Anilaeernb@gmail.com

  —

 

26

Ponna

 Srisailam

Asst. Executive Engineer

 Mahabubabad  I Buildings

8523085224

ponnasree45@gmail.com

On Deputation to Work in District (R&B) Office Jangaon on working arrangement basis

 

27

Nagula

 Raju

Asst. Executive Engineer

Gudur

9642148659

nagularaju3@gmail.com

  —

 

28

Tejavath

Jaya Sree

Asst. Executive Engineer

Mahabubabad II Roads

7660848067

jayasreeaeernb7@gmail.com

  —

 

29

Danggubati Venkateshwarlu

Harichnadra Prasad

Asst Engineer

Kothaguda

9701494573

harischandraprasad2@gmail.com

  —

 

30

1

1

0

Reguri

Laxman Babu

 -do-

  —

8919896923

laxmanbabu1969@gmail.com

On Deputation to Work in S.E. (R&B) Regional Office, Warangal on working arrangement basis

 

31

1

1

0

Banna

Veera Swamy

 -do-

  —

8328403302

  —

 

 

32

2

2

0

Mohd

 Farjana

 -do-

  —

9121346958

  —

  —

 

33

Bollepalli

 Sathamma

 -do-

  —

8464858065

  —

 

 

34

1

0

1

  —

  —

Watchman

  —

  —

  —

  —

 

(R&B) Sub Division Maripeda

 

35

1

1

0

Bhukya

 Shyam Singh

Dy. Executive Engineer

  —

8333923852

deerb.bmd@gmail.com

  —

 

36

4

3

1

VallaBoju

 Siva Kumar

Asst. Executive Engineer

Maripeda

9440818701

civilshiva@gmail.com

  —

 

37

Bodda

 Chaitanya

Asst. Executive Engineer

Dornakal

9440818706

chaitu106@gmail.com

  —

 

38

Pavurala

 Sandeep

Asst. Executive Engineer

Thorrur

9440818704

sandeeppavurala99@gmail.com

 

 

39

  —

  —

  —

  —

  —

  —

Narsimhulapeta

 

 

 

 

40

1

1

0

Banoth

 Ranjith Naik

 -do-

  —

9603898549

banothranjithnaik3@gmail.com

  —

 

41

1

1

0

Kudumula

 Padmavathi

 -do-

  —

7286800460

  —

  —